04/19/2024
4:47 AM

The time is a preferred time only and cannot be guaranteed.  The City of Tracy will do its best to accommodate the requests, but staffing levels and the number of inspections will dictate when the inspection will occur. 

On the day of a scheduled inspection, customers can call the City of Tracy at 209-831-6400 any time after 8:00 a.m.  The City of Tracy will then give you the assigned inspector’s name and cell phone number.  Customers can then contact the inspector to get an estimated timeframe as to when the inspector will arrive for the inspection.

 
Permit No. 19-0031 Permit Type   COMM Site Address   1447 MARIANI CT
TRACY, CA 95376
Applied   01/07/2019 Applicant   TERESA GOODWIN- HPA
Approved   07/02/2019 Owner   SCANNELL PROPERTIES #340 LLC
Issued   07/08/2019 Contractor   BCM CONSTRUCTION COMPANY INC
Parent Permit No.   G19-0003 Description   155,942SQFT SPECULATIVE INDUSTRIAL BLDG (Scannell)
  Notes   (1/7/2019 5:40 PM NJ) Receipt# 003854-0074 (3/22/2019 10:29 AM KM) total impervious area = 466,403 sf storm drain ECUs = 148.54 total landscape area = 17,783 sf (6/4/2019 3:41 PM LWE) FND ONLY PD #4331-0077 (7/3/2019 10:51 AM LG) Receipt # 004423-0100
 
  Date of Inspection Inspection Type Inspector Result Remarks Notes

 09/06/2019024-SLABSHAIN NIVENNOT READY190031_190905155504.wav

 09/09/2019024-SLABSHAIN NIVENPARTIAL APPROVAL3/24/2020 10:19:20 AM Closure Strip at Northern side from grid lines A to E and 1 to 15 approved

 09/09/2019022-FOOTINGS/PIERSSHAIN NIVENPARTIAL APPROVAL9/9/2019 12:00:00 AM Footings for retaining wall between gridlines 5.3 and 7.7 at rail spur approved ok to proceed. Notre: Footings at Site wall locations not ready, install top section of footing reinforcement throughout entire footing as per approved plans, call for re-inspection when ready. Provide RFI from engineer as to maximum retaining allowed

 08/27/2019022-FOOTINGS/PIERSSHAIN NIVENPARTIAL APPROVAL8/27/2019 12:00:00 AM #4 rebar continuous in footing as per detail 1 and 2 on SD2, approved ok to proceed. Special inspection report received.

 09/04/2019024-SLABSHAIN NIVENNOT READY

 09/19/2019051-ROOF DIAPHRAGMSHAIN NIVENPARTIAL APPROVAL9/19/2019 12:00:00 AM Roof nail approved from gridlines 6 to 12

 09/23/2019051-ROOF DIAPHRAGMSHAIN NIVENAPPROVED9/19/2019 12:00:00 AM Roof nail approved from gridlines 6 to 12

 09/16/2019051-ROOF DIAPHRAGMSHAIN NIVENCANCELLED

 08/07/2019122-TILTUP PANELSSHAIN NIVENPARTIAL APPROVAL3/24/2020 10:16:21 AM Panels 65 and 69 approved

 08/05/2019122-TILTUP PANELSSHAIN NIVENCORRECTION NOTICE190031_190801143547.wav8/5/2019 12:00:00 AM Panels 79, 12 and 16 need #6 bars under openings as per approved plans. All other panels approved. Special inspection report verified.

 07/30/2019122-TILTUP PANELSSHAIN NIVENPARTIAL APPROVAL7/30/2019 12:00:00 AM Panels 45-47, 52 and 63 -77 approved. Special inspection report received. Note: Ok to proceed at own risk with Panels 65 and 69, Nelson studs to ledger is noted as being badly bent and require engineer solution for repair.

 06/20/2019024-SLABJAMES ALLISONPARTIAL APPROVALAM PLEASE6/19/2019 12:00:00 AM DAVID 530-966-2716 (6/20/2019 4:32 PM JA) Partial approval for slab for west side south of freezer to completed slab. See marked approved plans. Freezer area still to complete.

 06/11/2019013-STORM DRAINSHAIN NIVENPARTIAL APPROVALlate afternoon6/11/2019 12:00:00 AM Storm Drain located at Upper North / East side to Lower South / East side of property approved, ok to back fill Camera inspection will be needed prior to final approval. Storm drain final connections pending Easement approval.

 06/24/2019022-FOOTINGS/PIERSSHAIN NIVENPARTIAL APPROVALPM6/24/2019 12:00:00 AM Footings for gridlines E/3 to 14 and A 3.8 to 11.7 approved. Special inspection report received.

 06/19/2019022-FOOTINGS/PIERSSHAIN NIVENPARTIAL APPROVALEarly AM6/19/2019 12:00:00 AM Footings at N/E grid line 1 to 3.8 , N/W Grid lines 1 to 3 and Northern grid line A to E approved, ok to proceed. Special inspection report verified.

 06/18/2019024-SLABSHAIN NIVENPARTIAL APPROVALEarly AM6/18/2019 12:00:00 AM Slab from grid lines 1 to 7.5 and A to C approved ( not including freezer section) ok to proceed. At grid line 1 to 2 & A to E the 13' and 18'10" sections of slab at freezer area approved ok to proceed with 4" concrete slab. Plans are highlighted on page S-1.1

 07/30/2019122-TILTUP PANELSSHAIN NIVENNOT READY

 07/02/2019022-FOOTINGS/PIERSSHAIN NIVENPARTIAL APPROVALReq AM

 07/09/2019122-TILTUP PANELSSHAIN NIVENPARTIAL APPROVAL7/9/2019 12:00:00 AM Panels 25 through 44 inspected and approved. Special inspection report received.

 06/11/2019024-SLABSHAIN NIVENPARTIAL APPROVALPM6/11/2019 12:00:00 AM 6" slab inspected and approved from grid lines 7.5 to 15 & A to C. Special inspection report received. Ok to proceed

 06/12/2019024-SLABSHAIN NIVENCORRECTION NOTICEPM6/12/2019 12:00:00 AM 6" slab inspected and approved from grid lines 7.5 to 15 & C to E. Exception gridline 13-15 / D to E, requires 15mil Stego wrap. Ok to proceed with 1:00 am concrete pour, Pending special inspection and approval of vapor barrier installation in section noted above.

 07/30/2019122-TILTUP PANELSSHAIN NIVENCORRECTION NOTICE7/30/2019 12:00:00 AM Panel 78 requires #4 rebar to nelson studs at ledger and #5 rebar at panel to slab hooks.

 08/05/2019122-TILTUP PANELSSHAIN NIVENPARTIAL APPROVAL8/5/2019 12:00:00 AM Panels 1 through 18, and 78, 79 are approved ok to proceed. Special inspection report verified. Panel door openings for panels # 4, 7 and 12 are installed as per detail page SK.5, SK.5A and SK.5B,

 08/05/2019SITE VISITSHAIN NIVENCOMPLETED8/5/2019 12:00:00 AM Spoke with David Cosby / Project Superintendent in regards to dust control. David said he will have a water truck onsite to control dust by 8/6/19

 08/06/2019010-UNDERGROUND PLUMSHAIN NIVENPARTIAL APPROVAL8/6/2019 12:00:00 AM 3" domestic water approved to cover. Final connections and testing still needed.

 09/05/2019024-SLABSHAIN NIVENCORRECTION NOTICE9/5/2019 12:00:00 AM At closure strip between gridlines A through E and 1 through 15, not including the north side 1) Install 15 mil Stego at required locations 2) Install dowel baskets at gridlines as per approved plans.

 09/17/2019024-SLABSHAIN NIVENNOT READY

 09/17/2019051-ROOF DIAPHRAGMSHAIN NIVENPARTIAL APPROVAL9/19/2019 12:00:00 AM Roof nail approved from gridline 1 to 6 Provide RFI from engineer for sections of sheathing that does not have approved offset as per approved plans. Located at N/W section of roof, between gridlines 2 and 4.

 09/17/2019022-FOOTINGS/PIERSSHAIN NIVENPARTIAL APPROVAL

 07/11/2019122-TILTUP PANELSSHAIN NIVENNOT READY

 06/11/2019013-STORM DRAINSHAIN NIVENPARTIAL APPROVAL6/11/2019 12:00:00 AM Storm Drain located at Upper North / West side to Lower South / West side of property approved, ok to back fill Camera inspection will be needed prior to final approval. Storm drain final connections pending Easement approval.

 06/11/2019031-UNDERFLOOR PLUMBSHAIN NIVENPARTIAL APPROVAL6/11/2019 12:00:00 AM Under floor/slab plumbing at south end of building approved, ok to back fill. * Connection to building sewer still needed.

 06/11/2019010-UNDERGROUND PLUMSHAIN NIVENPARTIAL APPROVAL6/11/2019 12:00:00 AM 6" SDR pipe / building sewer installation approved, subject to pressure test, ok to back fill at own risk. Connection to building sanitary drainage still needed. Note: Plastic pipe not allowed in footing, check connection prior to final approval.

 06/11/2019022-FOOTINGS/PIERSSHAIN NIVENPARTIAL APPROVAL6/11/2019 12:00:00 AM Interior / slab footings as per page S1.1 approved ok to proceed. Special inspection report verified.

 09/26/2019065-ROUGH BLDG/FRAMESHAIN NIVENPARTIAL APPROVALAM9/26/2019 3:30:52 PM Electrical room framing and interior side of sheet rock nailing approved

 09/26/2019022-FOOTINGS/PIERSSHAIN NIVENNOT READYAM

 09/26/2019067-ROUGH MECHSHAIN NIVENNOT READY

 10/03/2019022-FOOTINGS/PIERSSHAIN NIVENAPPROVED10/3/2019 11:14:49 AM Ramp wall footings and trash enclosure footings approved as per detail S-4.7, 4.8, 4.9 and RFI 39

 10/09/2019092-ELECT SERVICESHAIN NIVENAPPROVED10/9/2019 10:12:12 AM Switch gear torque inspection approved Provide RFI for switch gear anchor bolts detailing size, grade and torque specifications

 10/18/2019024-SLABSHAIN NIVENPARTIAL APPROVALeTRAKiT Inspection Request10/17/2019 8:29:32 AM 10/17/2019 8:29 AM BCM CONSTRUCTION COMPANY INC Contact Name: BCM CONSTRUCTION COMPANY INC Site Address: 1447 MARIANI CT Phone: 5303421722 e-Mail: david@bcmconstruction.com 10/18/2019 9:48:39 AM Reinforcement for concrete slab at dock bays approved ok to proceed

 10/18/2019066-ROUGH PLUMBSHAIN NIVENPARTIAL APPROVALeTRAKiT Inspection Request10/17/2019 8:29:32 AM 10/17/2019 8:29 AM BCM CONSTRUCTION COMPANY INC Contact Name: BCM CONSTRUCTION COMPANY INC Site Address: 1447 MARIANI CT Phone: 5303421722 e-Mail: david@bcmconstruction.com 10/18/2019 11:04:06 AM Primary and secondary roof overflow drains appproved

 10/29/2019065-ROUGH BLDG/FRAMESHAIN NIVENCANCELLEDeTRAKiT Inspection Request10/28/2019 4:28:16 PM 10/28/2019 4:28 PM BCM CONSTRUCTION COMPANY INC Contact Name: BCM CONSTRUCTION COMPANY INC Site Address: 1447 MARIANI CT Phone: 5303421722 e-Mail: david@bcmconstruction.com

 10/30/2019102-ROOF NAILSHAIN NIVENCANCELLEDeTRAKiT Inspection Request10/29/2019 5:22:26 PM 10/29/2019 5:22 PM BCM CONSTRUCTION COMPANY INC Contact Name: BCM CONSTRUCTION COMPANY INC Site Address: 1447 MARIANI CT Phone: 5303421722 e-Mail: david@bcmconstruction.com

 10/30/2019124-MASONRY/BLOCK WASHAIN NIVENAPPROVEDeTRAKiT Inspection Request10/29/2019 5:22:26 PM 10/29/2019 5:22 PM BCM CONSTRUCTION COMPANY INC Contact Name: BCM CONSTRUCTION COMPANY INC Site Address: 1447 MARIANI CT Phone: 5303421722 e-Mail: david@bcmconstruction.com 10/30/2019 9:14:44 PM CMU sound wall at railroad track location approved, ok to Proceed with grout placement

 10/30/2019101-STRUCTURAL / FRASHAIN NIVENCORRECTION NOTICEeTRAKiT Inspection Request10/29/2019 5:22:26 PM 10/29/2019 5:22 PM BCM CONSTRUCTION COMPANY INC Contact Name: BCM CONSTRUCTION COMPANY INC Site Address: 1447 MARIANI CT Phone: 5303421722 e-Mail: david@bcmconstruction.com 10/30/2019 9:14:48 PM Platform framing for rooftop refrigeration unit is under sized per submitted plans. Build to submitted plans or provide RFI from designer.

 11/01/2019065-ROUGH BLDG/FRAMESHAIN NIVENPARTIAL APPROVALeTRAKiT Inspection Request10/31/2019 1:37:18 PM 10/31/2019 1:37 PM BCM CONSTRUCTION COMPANY INC Contact Name: BCM CONSTRUCTION COMPANY INC Site Address: 1447 MARIANI CT Phone: 5303421722 e-Mail: david@bcmconstruction.com 11/1/2019 5:21:18 PM Demising wall framing approved. Insulation will not be installed, ok to drywall both sides

 11/01/2019024-SLABSHAIN NIVENPARTIAL APPROVALeTRAKiT Inspection Request10/31/2019 1:37:18 PM 10/31/2019 1:37 PM BCM CONSTRUCTION COMPANY INC Contact Name: BCM CONSTRUCTION COMPANY INC Site Address: 1447 MARIANI CT Phone: 5303421722 e-Mail: david@bcmconstruction.com 11/1/2019 5:21:22 PM Re enforcement for ramps slabs at North side of building and Trash enclosure slab approved. Ok to proceed.

 11/05/2019101-STRUCTURAL / FRASHAIN NIVENCORRECTION NOTICEeTRAKiT Inspection Request10/31/2019 1:37:18 PM 10/31/2019 1:37 PM BCM CONSTRUCTION COMPANY INC Contact Name: BCM CONSTRUCTION COMPANY INC Site Address: 1447 MARIANI CT Phone: 5303421722 e-Mail: david@bcmconstruction.com 11/5/2019 3:42:34 PM At Pump house roof framing, All required HDU8's shall be fully seated against wood framing member. Several HDU8's are twisted as currently installed.

 11/14/2019065-ROUGH BLDG/FRAMESHAIN NIVENPARTIAL APPROVALeTRAKiT Inspection Request11/13/2019 2:21:20 PM 11/13/2019 2:21 PM BCM CONSTRUCTION COMPANY INC Contact Name: BCM CONSTRUCTION COMPANY INC Site Address: 1447 MARIANI CT Phone: 5303421722 e-Mail: david@bcmconstruction.com 11/14/2019 10:36:18 AM Demising wall framing approved, ok to Sheetrock 2nd side.

 12/08/2019065-ROUGH BLDG/FRAMESHAIN NIVENCORRECTION NOTICEeTRAKiT Inspection Request12/4/2019 2:18:04 PM 12/4/2019 2:17 PM BCM CONSTRUCTION COMPANY INC Contact Name: BCM CONSTRUCTION COMPANY INC Site Address: 1447 MARIANI CT Phone: 5303421722 e-Mail: david@bcmconstruction.com 12/8/2019 5:48:13 PM At South / East corner of building install 4 missing Truss braces required as per approved plans.

 12/10/2019051-ROOF DIAPHRAGMSHAIN NIVENCORRECTION NOTICEeTRAKiT Inspection Request11/27/2019 1:06:27 PM 11/27/2019 1:06 PM BCM CONSTRUCTION COMPANY INC Contact Name: BCM CONSTRUCTION COMPANY INC Site Address: 1447 MARIANI CT Phone: 5303421722 e-Mail: david@bcmconstruction.com 12/10/2019 7:19:45 AM Inspected roof Trusses a, bracing and welded connection. Install missing Truss bracing at 4 locations, (1) at Fire control room and (3) South/ East corner.

 12/13/2019103-FINAL ROOF**SHAIN NIVENAPPROVEDeTRAKiT Inspection Request12/11/2019 11:07:38 AM 12/11/2019 11:07 AM BCM CONSTRUCTION COMPANY INC Contact Name: BCM CONSTRUCTION COMPANY INC Site Address: 1447 MARIANI CT Phone: 5303421722 e-Mail: david@bcmconstruction.com

 12/13/2019064-ALL ROUGHSHAIN NIVENPARTIAL APPROVALeTRAKiT Inspection Request12/11/2019 11:07:39 AM 12/11/2019 11:07 AM BCM CONSTRUCTION COMPANY INC Contact Name: BCM CONSTRUCTION COMPANY INC Site Address: 1447 MARIANI CT Phone: 5303421722 e-Mail: david@bcmconstruction.com

 12/26/2019140-FINAL ACCESSIBILSTEVE MONCURCORRECTION NOTICE12/27/2019 10:53:05 AM See attachment with permit 190849

 12/30/2019140-FINAL ACCESSIBILSTEVE MONCURCORRECTION NOTICE12/30/2019 7:16:19 AM Path of Travel at front parking lot entry storm swale location, concrete to asphalt transition exceeding 3/4” Parking lot; missing all required signage throughout parking lot Access aisle at front of building north to south at 3.6% slope, repair as needed Front of building Van parking 2.7% slope at rear tire location, repair as needed Missing painted blue border at the top of all access aisle throughout parking lot Exit tactile signs to be 9” to center at door locations throughout building At Building South/West double glass door, threshold to concrete gap exceeding 1/2”, relocate tactile sign to right side of double doors South side of building at 3rd accessible parking stalls from front of building, access aisle at 2.4% slope, repair as needed Elevated door landing at South/West location, bottom of landing has 2” drop repair as needed, add truncated domes as needed. North/West ramp, mid landing has 2.5% slope, repair as needed Remove sharp slag from handrails throughout as needed Install missing ramp signs and areas of refuge signs throughout. North side of buildings, top landings at ramps to be minimum 78” Notes: North, South, East, West directions based on approved plans. Inspection stopped, not a complete inspection, additional corrections may follow.

 12/31/2019023-UFERGROUNDSHAIN NIVENAPPROVED

 01/02/2020068-ROUGH ELECTSHAIN NIVENCORRECTION NOTICE1/2/2020 7:08:23 AM Torqued panels: L2, H2, HS1, HS2 and L At Truckers bathroom, above the drop ceiling secure the MC cable and add larger j-box to accommodate box fill. Charging station disconnects approved Not a complete inspection additional corrections may follow.

 08/08/2019010-UNDERGROUND PLUMSHAIN NIVENAPPROVED3/24/2020 10:55:35 AM All underground plumbing for Shell approved

 01/08/2020068-ROUGH ELECTSHAIN NIVENAPPROVED

 01/10/2020224-FIRE TCO BPDAN STOWEAPPROVEDSEE NOTES FOR TCO1/10/2020 4:25:55 PM All fire protection systems installed have been tested and approved. Inspector left systems in working order. TCO approved.

 01/13/2020135-FINAL MECH**SHAIN NIVENCANCELLED

 01/13/2020133-FINAL PLUM**SHAIN NIVENCANCELLED

 01/14/2020134-FINAL ELEC**SHAIN NIVENCANCELLED

 03/04/2020FINAL PLANNINGKIMBERLY MATLOCKAPPROVEDsee notes3/4/2020 12:31:55 PM paint exhaust vent on pump house to match wall verify screening shrubs around transformer 3/4/2020 4:02:12 PM Spoke with David (contractor). Vent can be painted but won't stick. OK to leave unpainted as shrubs in front will grow tall enough to screen at maturity. The approved LS plan shows a substantial number of shrubs in front of the transformer, but the site plan was redlined by the plan checker to provide a mandoor and sidewalk in the planter area where the screening shrubs were supposed to be planted. Spoke with David and he will verify with the landscaper that additional shrubs can be squeezed in front of the transformer and will send photo of proof when planted. OK to release final inspection. 3/23/2020 2:28:33 PM Received confirmation from Shain and a photo of the additional screen shrubs for the transformer.

 03/23/2020225-FIRE FINAL BPDAN STOWEAPPROVEDSee Notes3/23/2020 4:41:14 PM Fire Final Approved. Emergency Responder Radio Coverage Test Preformed with 1 tenant occupying 1 of the three spaces. All spaces passed radio test. Knox boxes locked with current keys to building. All fire protection systems were in normal condition when fire final was approved.

 08/08/2019122-TILTUP PANELSSHAIN NIVENALREADY DONE

 09/19/2019024-SLABSHAIN NIVENPARTIAL APPROVAL3/24/2020 10:20:18 AM Closure strip at freezer location approved

 10/10/2019083-GAS TESTSHAIN NIVENAPPROVEDeTRAKiT Inspection Request10/9/2019 10:33:33 AM 10/9/2019 10:33 AM BCM CONSTRUCTION COMPANY INC Contact Name: BCM CONSTRUCTION COMPANY INC Site Address: 1447 MARIANI CT Phone: 5303421722 e-Mail: david@bcmconstruction.com 10/10/2019 9:59:36 AM Gas test from meter location to both T.I offices approved 3/24/2020 10:21:03 AM Gas test for Shell approved

 10/09/2019ROUGH ELECTRICALSHAIN NIVENCORRECTION NOTICE3/24/2020 10:26:52 AM Tighten all loose conduit fittings Install single action hardware to doors in electrical room Bond all metal boxes throughout as needed Bond building steel to Transformer

 10/29/2019102-ROOF NAILSHAIN NIVENPARTIAL APPROVALeTRAKiT Inspection Request10/28/2019 4:28:16 PM 10/28/2019 4:28 PM BCM CONSTRUCTION COMPANY INC Contact Name: BCM CONSTRUCTION COMPANY INC Site Address: 1447 MARIANI CT Phone: 5303421722 e-Mail: david@bcmconstruction.com 3/24/2020 10:28:57 AM Roof nail from gridlines 12 to 15 approved Roof nail to shell completed, pump house nailing still needs to be inspected

 11/01/2019102-ROOF NAILSHAIN NIVENAPPROVEDeTRAKiT Inspection Request10/31/2019 1:37:18 PM 10/31/2019 1:37 PM BCM CONSTRUCTION COMPANY INC Contact Name: BCM CONSTRUCTION COMPANY INC Site Address: 1447 MARIANI CT Phone: 5303421722 e-Mail: david@bcmconstruction.com 11/1/2019 5:21:15 PM Roof nail for pump house approved 3/24/2020 10:30:48 AM All Roof nailing for permit approved.

 11/14/2019103-FINAL ROOF**SHAIN NIVENCORRECTION NOTICEeTRAKiT Inspection Request11/13/2019 2:21:20 PM 11/13/2019 2:21 PM BCM CONSTRUCTION COMPANY INC Contact Name: BCM CONSTRUCTION COMPANY INC Site Address: 1447 MARIANI CT Phone: 5303421722 e-Mail: david@bcmconstruction.com 3/24/2020 10:34:08 AM Sections of TPO roof need to be patched, from roof top cooler base modifications to unit 103.

 11/14/2019024-SLABSHAIN NIVENPARTIAL APPROVALeTRAKiT Inspection Request11/13/2019 2:21:20 PM 11/13/2019 2:21 PM BCM CONSTRUCTION COMPANY INC Contact Name: BCM CONSTRUCTION COMPANY INC Site Address: 1447 MARIANI CT Phone: 5303421722 e-Mail: david@bcmconstruction.com 3/24/2020 10:37:24 AM Infill at Brace frame location approved

 08/14/2019STORM DRAINSHAIN NIVENAPPROVED3/24/2020 10:42:05 AM Storm drain camera inspection results received

 09/20/2019UNDERGROUND ELECTRICALSHAIN NIVENAPPROVED9/20/2019 12:00:00 AM Piers/ reinforcement for parking lot lighting approved, ok to proceed.

 11/14/2019FOOTINGS / PIERSSHAIN NIVENAPPROVED3/24/2020 11:00:39 AM All Footings / piers have been completed

 06/06/2019031-UNDERFLOOR PLUMBSHAIN NIVENAPPROVED6/5/2019 12:00:00 AM sched by David Cosby 530-966-2716 (6/11/2019 3:10 PM SHAI) Underfloor /Slab plumbing at North end of building approved. Connection to building sewer still needed.

 09/12/2019033-UNDERFLOOR ELECSHAIN NIVENAPPROVED190031_190911165334.wav9/12/2019 12:00:00 AM Conduit for exterior lighting approved at East and west side of building, ok to cover. 3/24/2020 11:04:42 AM Conduit at dock locations approved

 07/12/2019UNDER FLOOR INSULATIONSHAIN NIVENAPPROVEDLate AM7/12/2019 12:00:00 AM Slab on grade over insulated panels at Gridlines 1 to 2 and A.8 to E approved, ok to proceed. Special inspection report received.

 12/09/2019051-ROOF DIAPHRAGMSHAIN NIVENAPPROVED

 12/13/2019024-SLABSHAIN NIVENALREADY DONEeTRAKiT Inspection Request12/11/2019 11:07:39 AM 12/11/2019 11:07 AM BCM CONSTRUCTION COMPANY INC Contact Name: BCM CONSTRUCTION COMPANY INC Site Address: 1447 MARIANI CT Phone: 5303421722 e-Mail: david@bcmconstruction.com 3/24/2020 10:38:21 AM All slabs have been completed and approved for this permit

 09/25/2019123-TILTUP PANELSSHAIN NIVENAPPROVED12/31/2019 10:26:37 AM Ramp walls, trash enclosure and pump house panels approved. This completes all tilt-up panels for the building.

 01/10/2020GAS SERVICESHAIN NIVENAPPROVED

 11/19/2019DRYWALL NAIL - 1ST LAYERSHAIN NIVENPARTIAL APPROVALeTRAKiT Inspection Request11/27/2019 1:06:00 PM 11/27/2019 1:05 PM BCM CONSTRUCTION COMPANY INC Contact Name: BCM CONSTRUCTION COMPANY INC Site Address: 1447 MARIANI CT Phone: 5303421722 e-Mail: david@bcmconstruction.com 3/24/2020 12:33:15 PM Demising drywall approved

 12/04/2019065-ROUGH BLDG/FRAMESHAIN NIVENCORRECTION NOTICEeTRAKiT Inspection Request11/27/2019 1:06:59 PM 11/27/2019 1:06 PM BCM CONSTRUCTION COMPANY INC Contact Name: BCM CONSTRUCTION COMPANY INC Site Address: 1447 MARIANI CT Phone: 5303421722 e-Mail: david@bcmconstruction.com 3/24/2020 12:34:03 PM Repair over spanned studs and blocking at fire control room

 12/12/2019DRYWALL NAIL - 1ST LAYERSHAIN NIVENAPPROVEDeTRAKiT Inspection Request12/11/2019 11:07:38 AM 12/11/2019 11:07 AM BCM CONSTRUCTION COMPANY INC Contact Name: BCM CONSTRUCTION COMPANY INC Site Address: 1447 MARIANI CT Phone: 5303421722 e-Mail: david@bcmconstruction.com 3/24/2020 12:36:34 PM Drywall at fire control room completed All drywall approved for this permit

 10/10/2019ROUGH PLUMBINGSHAIN NIVENAPPROVED3/25/2020 9:00:09 AM All rough plumbing for shell approved

 12/09/2019067-ROUGH MECHSHAIN NIVENALREADY DONE

 10/30/2019ROUGH MECHANICALSHAIN NIVENAPPROVED3/25/2020 9:04:38 AM All rough mechanical for this permit approved

 03/23/2020FINAL ACCESSIBILITYSHAIN NIVENAPPROVED

 03/23/2020FINAL BUILDING**SHAIN NIVENAPPROVED

 03/23/2020FINAL ELECTRICAL**SHAIN NIVENAPPROVED

 03/23/2020FINAL MECHANICAL**SHAIN NIVENAPPROVED

 03/23/2020FINAL PLUMBING**SHAIN NIVENAPPROVED