09/06/2019 | 024-SLAB | SHAIN NIVEN | NOT READY | 190031_190905155504.wav | |
|
09/09/2019 | 024-SLAB | SHAIN NIVEN | PARTIAL APPROVAL | | 3/24/2020 10:19:20 AM
Closure Strip at Northern side from grid lines A to E and 1 to 15 approved
|
|
09/09/2019 | 022-FOOTINGS/PIERS | SHAIN NIVEN | PARTIAL APPROVAL | | 9/9/2019 12:00:00 AM
Footings for retaining wall between gridlines 5.3 and 7.7 at rail spur approved ok to proceed.
Notre: Footings at Site wall locations not ready, install top section of footing reinforcement throughout entire footing as per approved plans, call for re-inspection when ready.
Provide RFI from engineer as to maximum retaining allowed
|
|
08/27/2019 | 022-FOOTINGS/PIERS | SHAIN NIVEN | PARTIAL APPROVAL | | 8/27/2019 12:00:00 AM
#4 rebar continuous in footing as per detail 1 and 2 on SD2, approved ok to proceed.
Special inspection report received.
|
|
09/04/2019 | 024-SLAB | SHAIN NIVEN | NOT READY | | |
|
09/19/2019 | 051-ROOF DIAPHRAGM | SHAIN NIVEN | PARTIAL APPROVAL | | 9/19/2019 12:00:00 AM
Roof nail approved from gridlines 6 to 12
|
|
09/23/2019 | 051-ROOF DIAPHRAGM | SHAIN NIVEN | APPROVED | | 9/19/2019 12:00:00 AM
Roof nail approved from gridlines 6 to 12
|
|
09/16/2019 | 051-ROOF DIAPHRAGM | SHAIN NIVEN | CANCELLED | | |
|
08/07/2019 | 122-TILTUP PANELS | SHAIN NIVEN | PARTIAL APPROVAL | | 3/24/2020 10:16:21 AM
Panels 65 and 69 approved
|
|
08/05/2019 | 122-TILTUP PANELS | SHAIN NIVEN | CORRECTION NOTICE | 190031_190801143547.wav | 8/5/2019 12:00:00 AM
Panels 79, 12 and 16 need #6 bars under openings as per approved plans. All other panels approved.
Special inspection report verified.
|
|
07/30/2019 | 122-TILTUP PANELS | SHAIN NIVEN | PARTIAL APPROVAL | | 7/30/2019 12:00:00 AM
Panels 45-47, 52 and 63 -77 approved.
Special inspection report received.
Note: Ok to proceed at own risk with Panels 65 and 69, Nelson studs to ledger is noted as being badly bent and require engineer solution for repair.
|
|
06/20/2019 | 024-SLAB | JAMES ALLISON | PARTIAL APPROVAL | AM PLEASE | 6/19/2019 12:00:00 AM
DAVID 530-966-2716
(6/20/2019 4:32 PM JA)
Partial approval for slab for west side south of freezer to completed slab. See marked approved plans.
Freezer area still to complete.
|
|
06/11/2019 | 013-STORM DRAIN | SHAIN NIVEN | PARTIAL APPROVAL | late afternoon | 6/11/2019 12:00:00 AM
Storm Drain located at Upper North / East side to Lower South / East side of property approved, ok to back fill
Camera inspection will be needed prior to final approval.
Storm drain final connections pending Easement approval.
|
|
06/24/2019 | 022-FOOTINGS/PIERS | SHAIN NIVEN | PARTIAL APPROVAL | PM | 6/24/2019 12:00:00 AM
Footings for gridlines E/3 to 14 and A 3.8 to 11.7 approved.
Special inspection report received.
|
|
06/19/2019 | 022-FOOTINGS/PIERS | SHAIN NIVEN | PARTIAL APPROVAL | Early AM | 6/19/2019 12:00:00 AM
Footings at N/E grid line 1 to 3.8 , N/W Grid lines 1 to 3 and Northern grid line A to E approved, ok to proceed. Special inspection report verified.
|
|
06/18/2019 | 024-SLAB | SHAIN NIVEN | PARTIAL APPROVAL | Early AM | 6/18/2019 12:00:00 AM
Slab from grid lines 1 to 7.5 and A to C approved ( not including freezer section) ok to proceed.
At grid line 1 to 2 & A to E the 13' and 18'10" sections of slab at freezer area approved ok to proceed with 4" concrete slab.
Plans are highlighted on page S-1.1
|
|
07/30/2019 | 122-TILTUP PANELS | SHAIN NIVEN | NOT READY | | |
|
07/02/2019 | 022-FOOTINGS/PIERS | SHAIN NIVEN | PARTIAL APPROVAL | Req AM | |
|
07/09/2019 | 122-TILTUP PANELS | SHAIN NIVEN | PARTIAL APPROVAL | | 7/9/2019 12:00:00 AM
Panels 25 through 44 inspected and approved.
Special inspection report received.
|
|
06/11/2019 | 024-SLAB | SHAIN NIVEN | PARTIAL APPROVAL | PM | 6/11/2019 12:00:00 AM
6" slab inspected and approved from grid lines 7.5 to 15 & A to C.
Special inspection report received.
Ok to proceed
|
|
06/12/2019 | 024-SLAB | SHAIN NIVEN | CORRECTION NOTICE | PM | 6/12/2019 12:00:00 AM
6" slab inspected and approved from grid lines 7.5 to 15 & C to E.
Exception gridline 13-15 / D to E, requires 15mil Stego wrap.
Ok to proceed with 1:00 am concrete pour, Pending special inspection and approval of vapor barrier installation in section noted above.
|
|
07/30/2019 | 122-TILTUP PANELS | SHAIN NIVEN | CORRECTION NOTICE | | 7/30/2019 12:00:00 AM
Panel 78 requires #4 rebar to nelson studs at ledger and #5 rebar at panel to slab hooks.
|
|
08/05/2019 | 122-TILTUP PANELS | SHAIN NIVEN | PARTIAL APPROVAL | | 8/5/2019 12:00:00 AM
Panels 1 through 18, and 78, 79 are approved ok to proceed.
Special inspection report verified.
Panel door openings for panels # 4, 7 and 12 are installed as per detail page SK.5, SK.5A and SK.5B,
|
|
08/05/2019 | SITE VISIT | SHAIN NIVEN | COMPLETED | | 8/5/2019 12:00:00 AM
Spoke with David Cosby / Project Superintendent in regards to dust control. David said he will have a water truck onsite to control dust by 8/6/19
|
|
08/06/2019 | 010-UNDERGROUND PLUM | SHAIN NIVEN | PARTIAL APPROVAL | | 8/6/2019 12:00:00 AM
3" domestic water approved to cover. Final connections and testing still needed.
|
|
09/05/2019 | 024-SLAB | SHAIN NIVEN | CORRECTION NOTICE | | 9/5/2019 12:00:00 AM
At closure strip between gridlines A through E and 1 through 15, not including the north side
1) Install 15 mil Stego at required locations
2) Install dowel baskets at gridlines as per approved plans.
|
|
09/17/2019 | 024-SLAB | SHAIN NIVEN | NOT READY | | |
|
09/17/2019 | 051-ROOF DIAPHRAGM | SHAIN NIVEN | PARTIAL APPROVAL | | 9/19/2019 12:00:00 AM
Roof nail approved from gridline 1 to 6
Provide RFI from engineer for sections of sheathing that does not have approved offset as per approved plans. Located at N/W section of roof, between gridlines 2 and 4.
|
|
09/17/2019 | 022-FOOTINGS/PIERS | SHAIN NIVEN | PARTIAL APPROVAL | | |
|
07/11/2019 | 122-TILTUP PANELS | SHAIN NIVEN | NOT READY | | |
|
06/11/2019 | 013-STORM DRAIN | SHAIN NIVEN | PARTIAL APPROVAL | | 6/11/2019 12:00:00 AM
Storm Drain located at Upper North / West side to Lower South / West side of property approved, ok to back fill
Camera inspection will be needed prior to final approval.
Storm drain final connections pending Easement approval.
|
|
06/11/2019 | 031-UNDERFLOOR PLUMB | SHAIN NIVEN | PARTIAL APPROVAL | | 6/11/2019 12:00:00 AM
Under floor/slab plumbing at south end of building approved, ok to back fill.
* Connection to building sewer still needed.
|
|
06/11/2019 | 010-UNDERGROUND PLUM | SHAIN NIVEN | PARTIAL APPROVAL | | 6/11/2019 12:00:00 AM
6" SDR pipe / building sewer installation approved, subject to pressure test, ok to back fill at own risk.
Connection to building sanitary drainage still needed.
Note: Plastic pipe not allowed in footing, check connection prior to final approval.
|
|
06/11/2019 | 022-FOOTINGS/PIERS | SHAIN NIVEN | PARTIAL APPROVAL | | 6/11/2019 12:00:00 AM
Interior / slab footings as per page S1.1 approved ok to proceed.
Special inspection report verified.
|
|
09/26/2019 | 065-ROUGH BLDG/FRAME | SHAIN NIVEN | PARTIAL APPROVAL | AM | 9/26/2019 3:30:52 PM
Electrical room framing and interior side of sheet rock nailing approved
|
|
09/26/2019 | 022-FOOTINGS/PIERS | SHAIN NIVEN | NOT READY | AM | |
|
09/26/2019 | 067-ROUGH MECH | SHAIN NIVEN | NOT READY | | |
|
10/03/2019 | 022-FOOTINGS/PIERS | SHAIN NIVEN | APPROVED | | 10/3/2019 11:14:49 AM
Ramp wall footings and trash enclosure footings approved as per detail S-4.7, 4.8, 4.9 and RFI 39
|
|
10/09/2019 | 092-ELECT SERVICE | SHAIN NIVEN | APPROVED | | 10/9/2019 10:12:12 AM
Switch gear torque inspection approved
Provide RFI for switch gear anchor bolts detailing size, grade and torque specifications
|
|
10/18/2019 | 024-SLAB | SHAIN NIVEN | PARTIAL APPROVAL | eTRAKiT Inspection Request | 10/17/2019 8:29:32 AM
10/17/2019 8:29 AM BCM CONSTRUCTION COMPANY INC
Contact Name: BCM CONSTRUCTION COMPANY INC
Site Address: 1447 MARIANI CT
Phone: 5303421722
e-Mail: david@bcmconstruction.com
10/18/2019 9:48:39 AM
Reinforcement for concrete slab at dock bays approved ok to proceed
|
|
10/18/2019 | 066-ROUGH PLUMB | SHAIN NIVEN | PARTIAL APPROVAL | eTRAKiT Inspection Request | 10/17/2019 8:29:32 AM
10/17/2019 8:29 AM BCM CONSTRUCTION COMPANY INC
Contact Name: BCM CONSTRUCTION COMPANY INC
Site Address: 1447 MARIANI CT
Phone: 5303421722
e-Mail: david@bcmconstruction.com
10/18/2019 11:04:06 AM
Primary and secondary roof overflow drains appproved
|
|
10/29/2019 | 065-ROUGH BLDG/FRAME | SHAIN NIVEN | CANCELLED | eTRAKiT Inspection Request | 10/28/2019 4:28:16 PM
10/28/2019 4:28 PM BCM CONSTRUCTION COMPANY INC
Contact Name: BCM CONSTRUCTION COMPANY INC
Site Address: 1447 MARIANI CT
Phone: 5303421722
e-Mail: david@bcmconstruction.com
|
|
10/30/2019 | 102-ROOF NAIL | SHAIN NIVEN | CANCELLED | eTRAKiT Inspection Request | 10/29/2019 5:22:26 PM
10/29/2019 5:22 PM BCM CONSTRUCTION COMPANY INC
Contact Name: BCM CONSTRUCTION COMPANY INC
Site Address: 1447 MARIANI CT
Phone: 5303421722
e-Mail: david@bcmconstruction.com
|
|
10/30/2019 | 124-MASONRY/BLOCK WA | SHAIN NIVEN | APPROVED | eTRAKiT Inspection Request | 10/29/2019 5:22:26 PM
10/29/2019 5:22 PM BCM CONSTRUCTION COMPANY INC
Contact Name: BCM CONSTRUCTION COMPANY INC
Site Address: 1447 MARIANI CT
Phone: 5303421722
e-Mail: david@bcmconstruction.com
10/30/2019 9:14:44 PM
CMU sound wall at railroad track location approved, ok to Proceed with grout placement
|
|
10/30/2019 | 101-STRUCTURAL / FRA | SHAIN NIVEN | CORRECTION NOTICE | eTRAKiT Inspection Request | 10/29/2019 5:22:26 PM
10/29/2019 5:22 PM BCM CONSTRUCTION COMPANY INC
Contact Name: BCM CONSTRUCTION COMPANY INC
Site Address: 1447 MARIANI CT
Phone: 5303421722
e-Mail: david@bcmconstruction.com
10/30/2019 9:14:48 PM
Platform framing for rooftop refrigeration unit is under sized per submitted plans.
Build to submitted plans or provide RFI from designer.
|
|
11/01/2019 | 065-ROUGH BLDG/FRAME | SHAIN NIVEN | PARTIAL APPROVAL | eTRAKiT Inspection Request | 10/31/2019 1:37:18 PM
10/31/2019 1:37 PM BCM CONSTRUCTION COMPANY INC
Contact Name: BCM CONSTRUCTION COMPANY INC
Site Address: 1447 MARIANI CT
Phone: 5303421722
e-Mail: david@bcmconstruction.com
11/1/2019 5:21:18 PM
Demising wall framing approved.
Insulation will not be installed, ok to drywall both sides
|
|
11/01/2019 | 024-SLAB | SHAIN NIVEN | PARTIAL APPROVAL | eTRAKiT Inspection Request | 10/31/2019 1:37:18 PM
10/31/2019 1:37 PM BCM CONSTRUCTION COMPANY INC
Contact Name: BCM CONSTRUCTION COMPANY INC
Site Address: 1447 MARIANI CT
Phone: 5303421722
e-Mail: david@bcmconstruction.com
11/1/2019 5:21:22 PM
Re enforcement for ramps slabs at North side of building and Trash enclosure slab approved. Ok to proceed.
|
|
11/05/2019 | 101-STRUCTURAL / FRA | SHAIN NIVEN | CORRECTION NOTICE | eTRAKiT Inspection Request | 10/31/2019 1:37:18 PM
10/31/2019 1:37 PM BCM CONSTRUCTION COMPANY INC
Contact Name: BCM CONSTRUCTION COMPANY INC
Site Address: 1447 MARIANI CT
Phone: 5303421722
e-Mail: david@bcmconstruction.com
11/5/2019 3:42:34 PM
At Pump house roof framing, All required HDU8's shall be fully seated against wood framing member. Several HDU8's are twisted as currently installed.
|
|
11/14/2019 | 065-ROUGH BLDG/FRAME | SHAIN NIVEN | PARTIAL APPROVAL | eTRAKiT Inspection Request | 11/13/2019 2:21:20 PM
11/13/2019 2:21 PM BCM CONSTRUCTION COMPANY INC
Contact Name: BCM CONSTRUCTION COMPANY INC
Site Address: 1447 MARIANI CT
Phone: 5303421722
e-Mail: david@bcmconstruction.com
11/14/2019 10:36:18 AM
Demising wall framing approved, ok to Sheetrock 2nd side.
|
|
12/08/2019 | 065-ROUGH BLDG/FRAME | SHAIN NIVEN | CORRECTION NOTICE | eTRAKiT Inspection Request | 12/4/2019 2:18:04 PM
12/4/2019 2:17 PM BCM CONSTRUCTION COMPANY INC
Contact Name: BCM CONSTRUCTION COMPANY INC
Site Address: 1447 MARIANI CT
Phone: 5303421722
e-Mail: david@bcmconstruction.com
12/8/2019 5:48:13 PM
At South / East corner of building install 4 missing Truss braces required as per approved plans.
|
|
12/10/2019 | 051-ROOF DIAPHRAGM | SHAIN NIVEN | CORRECTION NOTICE | eTRAKiT Inspection Request | 11/27/2019 1:06:27 PM
11/27/2019 1:06 PM BCM CONSTRUCTION COMPANY INC
Contact Name: BCM CONSTRUCTION COMPANY INC
Site Address: 1447 MARIANI CT
Phone: 5303421722
e-Mail: david@bcmconstruction.com
12/10/2019 7:19:45 AM
Inspected roof Trusses a, bracing and welded connection.
Install missing Truss bracing at 4 locations, (1) at Fire control room and (3) South/ East corner.
|
|
12/13/2019 | 103-FINAL ROOF** | SHAIN NIVEN | APPROVED | eTRAKiT Inspection Request | 12/11/2019 11:07:38 AM
12/11/2019 11:07 AM BCM CONSTRUCTION COMPANY INC
Contact Name: BCM CONSTRUCTION COMPANY INC
Site Address: 1447 MARIANI CT
Phone: 5303421722
e-Mail: david@bcmconstruction.com
|
|
12/13/2019 | 064-ALL ROUGH | SHAIN NIVEN | PARTIAL APPROVAL | eTRAKiT Inspection Request | 12/11/2019 11:07:39 AM
12/11/2019 11:07 AM BCM CONSTRUCTION COMPANY INC
Contact Name: BCM CONSTRUCTION COMPANY INC
Site Address: 1447 MARIANI CT
Phone: 5303421722
e-Mail: david@bcmconstruction.com
|
|
12/26/2019 | 140-FINAL ACCESSIBIL | STEVE MONCUR | CORRECTION NOTICE | | 12/27/2019 10:53:05 AM
See attachment with permit 190849
|
|
12/30/2019 | 140-FINAL ACCESSIBIL | STEVE MONCUR | CORRECTION NOTICE | | 12/30/2019 7:16:19 AM
Path of Travel at front parking lot entry storm swale location, concrete to asphalt transition exceeding 3/4”
Parking lot; missing all required signage throughout parking lot
Access aisle at front of building north to south at 3.6% slope, repair as needed
Front of building Van parking 2.7% slope at rear tire location, repair as needed
Missing painted blue border at the top of all access aisle throughout parking lot
Exit tactile signs to be 9” to center at door locations throughout building
At Building South/West double glass door, threshold to concrete gap exceeding 1/2”, relocate tactile sign to right side of double doors
South side of building at 3rd accessible parking stalls from front of building, access aisle at 2.4% slope, repair as needed
Elevated door landing at South/West location, bottom of landing has 2” drop repair as needed, add truncated domes as needed.
North/West ramp, mid landing has 2.5% slope, repair as needed
Remove sharp slag from handrails throughout as needed
Install missing ramp signs and areas of refuge signs throughout.
North side of buildings, top landings at ramps to be minimum 78”
Notes:
North, South, East, West directions based on approved plans.
Inspection stopped, not a complete inspection, additional corrections may follow.
|
|
12/31/2019 | 023-UFERGROUND | SHAIN NIVEN | APPROVED | | |
|
01/02/2020 | 068-ROUGH ELECT | SHAIN NIVEN | CORRECTION NOTICE | | 1/2/2020 7:08:23 AM
Torqued panels:
L2, H2, HS1, HS2 and L
At Truckers bathroom, above the drop ceiling secure the MC cable and add larger j-box to accommodate box fill.
Charging station disconnects approved
Not a complete inspection additional corrections may follow.
|
|
08/08/2019 | 010-UNDERGROUND PLUM | SHAIN NIVEN | APPROVED | | 3/24/2020 10:55:35 AM
All underground plumbing for Shell approved
|
|
01/08/2020 | 068-ROUGH ELECT | SHAIN NIVEN | APPROVED | | |
|
01/10/2020 | 224-FIRE TCO BP | DAN STOWE | APPROVED | SEE NOTES FOR TCO | 1/10/2020 4:25:55 PM
All fire protection systems installed have been tested and approved. Inspector left systems in working order. TCO approved.
|
|
01/13/2020 | 135-FINAL MECH** | SHAIN NIVEN | CANCELLED | | |
|
01/13/2020 | 133-FINAL PLUM** | SHAIN NIVEN | CANCELLED | | |
|
01/14/2020 | 134-FINAL ELEC** | SHAIN NIVEN | CANCELLED | | |
|
03/04/2020 | FINAL PLANNING | KIMBERLY MATLOCK | APPROVED | see notes | 3/4/2020 12:31:55 PM
paint exhaust vent on pump house to match wall
verify screening shrubs around transformer
3/4/2020 4:02:12 PM
Spoke with David (contractor). Vent can be painted but won't stick. OK to leave unpainted as shrubs in front will grow tall enough to screen at maturity.
The approved LS plan shows a substantial number of shrubs in front of the transformer, but the site plan was redlined by the plan checker to provide a mandoor and sidewalk in the planter area where the screening shrubs were supposed to be planted. Spoke with David and he will verify with the landscaper that additional shrubs can be squeezed in front of the transformer and will send photo of proof when planted. OK to release final inspection.
3/23/2020 2:28:33 PM
Received confirmation from Shain and a photo of the additional screen shrubs for the transformer.
|
|
03/23/2020 | 225-FIRE FINAL BP | DAN STOWE | APPROVED | See Notes | 3/23/2020 4:41:14 PM
Fire Final Approved. Emergency Responder Radio Coverage Test Preformed with 1 tenant occupying 1 of the three spaces. All spaces passed radio test. Knox boxes locked with current keys to building. All fire protection systems were in normal condition when fire final was approved.
|
|
08/08/2019 | 122-TILTUP PANELS | SHAIN NIVEN | ALREADY DONE | | |
|
09/19/2019 | 024-SLAB | SHAIN NIVEN | PARTIAL APPROVAL | | 3/24/2020 10:20:18 AM
Closure strip at freezer location approved
|
|
10/10/2019 | 083-GAS TEST | SHAIN NIVEN | APPROVED | eTRAKiT Inspection Request | 10/9/2019 10:33:33 AM
10/9/2019 10:33 AM BCM CONSTRUCTION COMPANY INC
Contact Name: BCM CONSTRUCTION COMPANY INC
Site Address: 1447 MARIANI CT
Phone: 5303421722
e-Mail: david@bcmconstruction.com
10/10/2019 9:59:36 AM
Gas test from meter location to both T.I offices approved
3/24/2020 10:21:03 AM
Gas test for Shell approved
|
|
10/09/2019 | ROUGH ELECTRICAL | SHAIN NIVEN | CORRECTION NOTICE | | 3/24/2020 10:26:52 AM
Tighten all loose conduit fittings
Install single action hardware to doors in electrical room
Bond all metal boxes throughout as needed
Bond building steel to Transformer
|
|
10/29/2019 | 102-ROOF NAIL | SHAIN NIVEN | PARTIAL APPROVAL | eTRAKiT Inspection Request | 10/28/2019 4:28:16 PM
10/28/2019 4:28 PM BCM CONSTRUCTION COMPANY INC
Contact Name: BCM CONSTRUCTION COMPANY INC
Site Address: 1447 MARIANI CT
Phone: 5303421722
e-Mail: david@bcmconstruction.com
3/24/2020 10:28:57 AM
Roof nail from gridlines 12 to 15 approved
Roof nail to shell completed, pump house nailing still needs to be inspected
|
|
11/01/2019 | 102-ROOF NAIL | SHAIN NIVEN | APPROVED | eTRAKiT Inspection Request | 10/31/2019 1:37:18 PM
10/31/2019 1:37 PM BCM CONSTRUCTION COMPANY INC
Contact Name: BCM CONSTRUCTION COMPANY INC
Site Address: 1447 MARIANI CT
Phone: 5303421722
e-Mail: david@bcmconstruction.com
11/1/2019 5:21:15 PM
Roof nail for pump house approved
3/24/2020 10:30:48 AM
All Roof nailing for permit approved.
|
|
11/14/2019 | 103-FINAL ROOF** | SHAIN NIVEN | CORRECTION NOTICE | eTRAKiT Inspection Request | 11/13/2019 2:21:20 PM
11/13/2019 2:21 PM BCM CONSTRUCTION COMPANY INC
Contact Name: BCM CONSTRUCTION COMPANY INC
Site Address: 1447 MARIANI CT
Phone: 5303421722
e-Mail: david@bcmconstruction.com
3/24/2020 10:34:08 AM
Sections of TPO roof need to be patched, from roof top cooler base modifications to unit 103.
|
|
11/14/2019 | 024-SLAB | SHAIN NIVEN | PARTIAL APPROVAL | eTRAKiT Inspection Request | 11/13/2019 2:21:20 PM
11/13/2019 2:21 PM BCM CONSTRUCTION COMPANY INC
Contact Name: BCM CONSTRUCTION COMPANY INC
Site Address: 1447 MARIANI CT
Phone: 5303421722
e-Mail: david@bcmconstruction.com
3/24/2020 10:37:24 AM
Infill at Brace frame location approved
|
|
08/14/2019 | STORM DRAIN | SHAIN NIVEN | APPROVED | | 3/24/2020 10:42:05 AM
Storm drain camera inspection results received
|
|
09/20/2019 | UNDERGROUND ELECTRICAL | SHAIN NIVEN | APPROVED | | 9/20/2019 12:00:00 AM
Piers/ reinforcement for parking lot lighting approved, ok to proceed.
|
|
11/14/2019 | FOOTINGS / PIERS | SHAIN NIVEN | APPROVED | | 3/24/2020 11:00:39 AM
All Footings / piers have been completed
|
|
06/06/2019 | 031-UNDERFLOOR PLUMB | SHAIN NIVEN | APPROVED | | 6/5/2019 12:00:00 AM
sched by David Cosby 530-966-2716
(6/11/2019 3:10 PM SHAI)
Underfloor /Slab plumbing at North end of building approved.
Connection to building sewer still needed.
|
|
09/12/2019 | 033-UNDERFLOOR ELEC | SHAIN NIVEN | APPROVED | 190031_190911165334.wav | 9/12/2019 12:00:00 AM
Conduit for exterior lighting approved at East and west side of building, ok to cover.
3/24/2020 11:04:42 AM
Conduit at dock locations approved
|
|
07/12/2019 | UNDER FLOOR INSULATION | SHAIN NIVEN | APPROVED | Late AM | 7/12/2019 12:00:00 AM
Slab on grade over insulated panels at Gridlines 1 to 2 and A.8 to E approved, ok to proceed.
Special inspection report received.
|
|
12/09/2019 | 051-ROOF DIAPHRAGM | SHAIN NIVEN | APPROVED | | |
|
12/13/2019 | 024-SLAB | SHAIN NIVEN | ALREADY DONE | eTRAKiT Inspection Request | 12/11/2019 11:07:39 AM
12/11/2019 11:07 AM BCM CONSTRUCTION COMPANY INC
Contact Name: BCM CONSTRUCTION COMPANY INC
Site Address: 1447 MARIANI CT
Phone: 5303421722
e-Mail: david@bcmconstruction.com
3/24/2020 10:38:21 AM
All slabs have been completed and approved for this permit
|
|
09/25/2019 | 123-TILTUP PANELS | SHAIN NIVEN | APPROVED | | 12/31/2019 10:26:37 AM
Ramp walls, trash enclosure and pump house panels approved.
This completes all tilt-up panels for the building.
|
|
01/10/2020 | GAS SERVICE | SHAIN NIVEN | APPROVED | | |
|
11/19/2019 | DRYWALL NAIL - 1ST LAYER | SHAIN NIVEN | PARTIAL APPROVAL | eTRAKiT Inspection Request | 11/27/2019 1:06:00 PM
11/27/2019 1:05 PM BCM CONSTRUCTION COMPANY INC
Contact Name: BCM CONSTRUCTION COMPANY INC
Site Address: 1447 MARIANI CT
Phone: 5303421722
e-Mail: david@bcmconstruction.com
3/24/2020 12:33:15 PM
Demising drywall approved
|
|
12/04/2019 | 065-ROUGH BLDG/FRAME | SHAIN NIVEN | CORRECTION NOTICE | eTRAKiT Inspection Request | 11/27/2019 1:06:59 PM
11/27/2019 1:06 PM BCM CONSTRUCTION COMPANY INC
Contact Name: BCM CONSTRUCTION COMPANY INC
Site Address: 1447 MARIANI CT
Phone: 5303421722
e-Mail: david@bcmconstruction.com
3/24/2020 12:34:03 PM
Repair over spanned studs and blocking at fire control room
|
|
12/12/2019 | DRYWALL NAIL - 1ST LAYER | SHAIN NIVEN | APPROVED | eTRAKiT Inspection Request | 12/11/2019 11:07:38 AM
12/11/2019 11:07 AM BCM CONSTRUCTION COMPANY INC
Contact Name: BCM CONSTRUCTION COMPANY INC
Site Address: 1447 MARIANI CT
Phone: 5303421722
e-Mail: david@bcmconstruction.com
3/24/2020 12:36:34 PM
Drywall at fire control room completed
All drywall approved for this permit
|
|
10/10/2019 | ROUGH PLUMBING | SHAIN NIVEN | APPROVED | | 3/25/2020 9:00:09 AM
All rough plumbing for shell approved
|
|
12/09/2019 | 067-ROUGH MECH | SHAIN NIVEN | ALREADY DONE | | |
|
10/30/2019 | ROUGH MECHANICAL | SHAIN NIVEN | APPROVED | | 3/25/2020 9:04:38 AM
All rough mechanical for this permit approved
|
|
03/23/2020 | FINAL ACCESSIBILITY | SHAIN NIVEN | APPROVED | | |
|
03/23/2020 | FINAL BUILDING** | SHAIN NIVEN | APPROVED | | |
|
03/23/2020 | FINAL ELECTRICAL** | SHAIN NIVEN | APPROVED | | |
|
03/23/2020 | FINAL MECHANICAL** | SHAIN NIVEN | APPROVED | | |
|
03/23/2020 | FINAL PLUMBING** | SHAIN NIVEN | APPROVED | | |
|