09/16/2020 | EXTENTION | LORNA MASON | APPROVED | see attached | |
|
02/22/2021 | EXPIRATION NOTICE SE | LORNA MASON | COMPLETED | | |
|
04/28/2021 | UNDERGROUND PLUMBING | SHAIN NIVEN | PARTIAL APPROVAL | | |
|
04/28/2021 | STORM DRAIN | SHAIN NIVEN | PARTIAL APPROVAL | | |
|
04/29/2021 | UNDERGROUND PLUMBING | SHAIN NIVEN | PARTIAL APPROVAL | | 4/29/2021 2:15:55 PM
6" SDR , approximately 100' at west end of property, running from north to south approved, ok to cover.
|
|
04/29/2021 | STORM DRAIN | SHAIN NIVEN | NOT READY | | |
|
04/30/2021 | UNDERGROUND PLUMBING | SHAIN NIVEN | ALREADY DONE | | |
|
04/30/2021 | STORM DRAIN | SHAIN NIVEN | ALREADY DONE | | |
|
05/03/2021 | STORM DRAIN | SHAIN NIVEN | PARTIAL APPROVAL | | 5/3/2021 3:52:47 PM
Storm drain at West end of property / Building 3 location approx. 60' ok to back fill.
|
|
05/03/2021 | UNDERGROUND PLUMBING | SHAIN NIVEN | PARTIAL APPROVAL | | 5/3/2021 3:53:09 PM
Storm drain at West end of property / Building 3 location approx. 60' ok to back fill.
|
|
05/04/2021 | UNDERGROUND PLUMBING | SHAIN NIVEN | CANCELLED | | |
|
05/04/2021 | STORM DRAIN | SHAIN NIVEN | PARTIAL APPROVAL | | 5/4/2021 3:40:29 PM
24" storm drain at west side of property running N/S installation completed, ok to fill.
|
|
05/06/2021 | UNDERGROUND PLUMBING | SHAIN NIVEN | CANCELLED | | |
|
05/06/2021 | STORM DRAIN | SHAIN NIVEN | CANCELLED | | |
|
05/10/2021 | UNDERGROUND PLUMBING | SHAIN NIVEN | CANCELLED | | |
|
05/10/2021 | STORM DRAIN | SHAIN NIVEN | CANCELLED | | |
|
05/12/2021 | UNDERGROUND PLUMBING | SHAIN NIVEN | CANCELLED | | 5/12/2021 3:57:09 PM
shai changed Inspection Type from MASONRY/BLOCK WALL to UNDERGROUND PLUMBING
5/12/2021 4:14:54 PM
Permit not issued for underground plumbing at this time
|
|
05/13/2021 | MASONRY/BLOCK WALL | SHAIN NIVEN | CORRECTION NOTICE | | 5/13/2021 4:09:35 PM
Contractor to stop all construction of Retaining wall, until further notice
Plans have not been approved.
|
|
05/14/2021 | MASONRY/BLOCK WALL | SHAIN NIVEN | CANCELLED | | |
|
05/19/2021 | UNDER FLOOR PLUMBING | SHAIN NIVEN | CORRECTION NOTICE | Bldg.10 & 7 Underground Plmbing Inspecti | 5/18/2021 3:44:20 PM
5/18/2021 3:43 PM KATERRA CONSTRUCTION LLC
Pending Foundations permit, need inspection of 2 buildings worth of underground plumbing
Contact Name: KATERRA CONSTRUCTION LLC
Site Address: 351 E VALPICO ROAD
Phone: 2063092229
e-Mail: Boyd.Lucas@Katerra.com
5/20/2021 9:24:00 AM
As previously discussed with onsite superintendent and plumbing contractor.
All thermoplastic pipe underground is to be firmly bedded in a minimum of 4" of granular fill.
|
|
05/23/2021 | UNDERGROUND PLUMBING | SHAIN NIVEN | CANCELLED | eTRAKiT Inspection Request | 5/19/2021 5:47:48 PM
5/19/2021 5:47 PM KATERRA CONSTRUCTION LLC
Contact Name: KATERRA CONSTRUCTION LLC
Site Address: 351 E VALPICO ROAD
Phone: 6504483726
e-Mail: boyd.lucas@katerra.com
|
|
05/24/2021 | UNDERGROUND PLUMBING | SHAIN NIVEN | PARTIAL APPROVAL | eTRAKiT Inspection Request | 5/21/2021 12:07:00 PM
5/21/2021 12:07 PM KATERRA CONSTRUCTION LLC
Contact Name: KATERRA CONSTRUCTION LLC
Site Address: 351 E Valpico
Phone: 9252959827
e-Mail: boyd.lucas@katerra.com
5/24/2021 4:10:44 PM
Under slab plumbing for building 10 approved, ok to cover
Note; sewer connection not ready, connection / inspection still needed.
|
|
05/27/2021 | UNDERGROUND PLUMBING | SHAIN NIVEN | PARTIAL APPROVAL | clubhouse underground plumbing | 5/26/2021 8:28:03 PM
5/26/2021 8:28 PM KATERRA CONSTRUCTION LLC
Contact Name: KATERRA CONSTRUCTION LLC
Site Address: 351 E VALPICO ROAD
Phone: 6504483726
e-Mail: boyd.lucas@katerra.com
5/27/2021 4:10:45 PM
Club house underground plumbing approved.
|
|
06/01/2021 | UNDERGROUND ELECTRICAL | SHAIN NIVEN | PARTIAL APPROVAL | eTRAKiT Inspection Request | 5/28/2021 9:14:42 AM
5/28/2021 9:14 AM KATERRA CONSTRUCTION LLC
Electrical sweeps into utility rooms for buildings 10 and 7.
Contact Name: Tyler Pryde
Site Address: 351 E Valpico Rd
Phone: 6028260948
e-Mail: tyler.pryde@katerra.com
6/1/2021 10:31:28 AM
Underground / slab counduit for buildings 7 and 10 approved.
|
|
07/08/2021 | SLAB | SHAIN NIVEN | APPROVED | Building 07 Rebar | 7/6/2021 3:28:15 PM
7/6/2021 3:28 PM KATERRA CONSTRUCTION LLC
Contact Name: KATERRA CONSTRUCTION LLC
Site Address: 351 E VALPICO ROAD
Phone: 6692540198
e-Mail: jwoodbury@guardian-capital.com
7/8/2021 3:42:09 PM
Building #7 slab approved
Special inspection report verified
|
|
07/06/2021 | SLAB | SHAIN NIVEN | APPROVED | eTRAKiT Inspection Request | 7/1/2021 4:26:25 PM
7/1/2021 4:26 PM Brent Bockie
Structural Slab/Rebar Building 10
Contact Name: Brent Bockie
Site Address: 351 E VALPICO ROAD
Phone: 9164676539
e-Mail: bbockie@guardian-capital.com
7/8/2021 4:14:57 PM
Building 10 Slab approved
Special inspection report received
|
|
07/19/2021 | SLAB | JAMES ALLISON | CORRECTION NOTICE | eTRAKiT Inspection Request | 7/16/2021 12:50:54 PM
7/16/2021 12:50 PM GUARDIAN CONSTRUCTION LP
Clubhouse Rebar
Contact Name: GUARDIAN CONSTRUCTION LP
Site Address: 351 E VALPICO ROAD
Phone: 6692540198
e-Mail: jwoodbury@guardian-capital.com
7/19/2021 4:20:09 PM
For clubhouse building slab and footings:
Electrical room area blocked out and not to pour
Provide clearances for grade beams throughout
Wrap plumbing with more foam throughout
Support rebar cages at spread footings throughout
Verify lap splice requirements per plans. #4 installed with only 18" laps in multiple areas. May need extended laps
Recall inspection prior to pour
Hold downs ok
|
|
07/20/2021 | SLAB | JAMES ALLISON | PARTIAL APPROVAL | eTRAKiT Inspection Request | 7/19/2021 4:18:10 PM
7/19/2021 4:18 PM GUARDIAN CONSTRUCTION LP
Clubhouse Rebar
Contact Name: GUARDIAN CONSTRUCTION LP
Site Address: 351 E VALPICO ROAD
Phone: 6692540198
e-Mail: jwoodbury@guardian-capital.com
7/20/2021 2:53:06 PM
Partial approval for slab and footings at Clubhouse as marked on approved mini set of plans
Still need electrical room area blocked out at this point
|
|
08/03/2021 | UNDERGROUND PLUMBING | SHAIN NIVEN | CORRECTION NOTICE | Building 11 | 8/2/2021 2:58:03 PM
8/2/2021 2:58 PM GUARDIAN CONSTRUCTION LP
Contact Name: GUARDIAN CONSTRUCTION LP
Site Address: 351 E VALPICO ROAD
Phone: 6692540198
e-Mail: jwoodbury@guardian-capital.com
8/3/2021 4:24:12 PM
Properly bed all underground plumbing
Not a complete inspection.
|
|
08/05/2021 | UNDERGROUND PLUMBING | SHAIN NIVEN | PARTIAL APPROVAL | eTRAKiT Inspection Request | 8/4/2021 4:13:02 PM
8/4/2021 4:13 PM GUARDIAN CONSTRUCTION LP
building 11
Contact Name: GUARDIAN CONSTRUCTION LP
Site Address: 351 E VALPICO ROAD
Phone: 2098100828
e-Mail: miked@rubikbuilt.com
8/5/2021 12:51:18 PM
Building 11 Underground plumbing approved
|
|
08/12/2021 | UNDERGROUND PLUMBING | SHAIN NIVEN | PARTIAL APPROVAL | building 9 | 8/9/2021 11:05:57 AM
8/9/2021 11:05 AM GUARDIAN CONSTRUCTION LP
building 9
Contact Name: GUARDIAN CONSTRUCTION LP
Site Address: 351 E VALPICO ROAD
Phone: 2098100828
e-Mail: miked@rubikbuilt.com
8/10/2021 10:44:16 AM
8/10/2021 10:44 AM GUARDIAN CONSTRUCTION LP
Contact Name: GUARDIAN CONSTRUCTION LP
Site Address: 351 E VALPICO ROAD
Phone: 2098100828
e-Mail: miked@rubikbuilt.com
|
|
08/23/2021 | UNDERGROUND PLUMBING | SHAIN NIVEN | PARTIAL APPROVAL | eTRAKiT Inspection Request | 8/19/2021 12:51:22 PM
8/19/2021 12:51 PM GUARDIAN CONSTRUCTION LP
building 8
Contact Name: Michael A Dos Reis
Site Address: 351 e valpico rd
Phone: 2098100828
e-Mail: miked@rubikbuilt.com
8/23/2021 3:28:54 PM
Building #8 approved
Note: Plumbing contractor was made aware that some vent plumbing might need to be lowered, as plumbing can't be located horizontal in a slab.
|
|
08/31/2021 | SLAB | SHAIN NIVEN | PARTIAL APPROVAL | building 11 and building 9 rebar | 8/30/2021 2:40:14 PM
8/30/2021 2:40 PM GUARDIAN CONSTRUCTION LP
Contact Name: GUARDIAN CONSTRUCTION LP
Site Address: 351 E VALPICO ROAD
Phone: 2098100828
e-Mail: miked@rubikbuilt.com
8/31/2021 4:11:04 PM
Building 11
Slab / footings approved pending repair of plumbing located in center of slab.
|
|
09/01/2021 | SITE VISIT | SHAIN NIVEN | COMPLETED | | 9/2/2021 4:16:23 PM
Inspector visited jobsite around 2PM to discuss a noise complaint received by the city around 5am.
Inspector spoke with Brent Bockie / Construction manager. Inspector informed Brent that jobsite construction shall not start before 7:00am.
|
|
09/02/2021 | SITE VISIT | SHAIN NIVEN | COMPLETED | | 9/2/2021 4:20:02 PM
Inspector visited jobsite around 2:30pm, to discuss with jobsite superintendent the need for dust control and maintaining clean city streets. Superintendent has agreed to take the required steps in order to maintain a clean and controlled environment.
|
|
09/08/2021 | UNDERGROUND PLUMBING | SHAIN NIVEN | PARTIAL APPROVAL | eTRAKiT Inspection Request | 9/3/2021 12:34:34 PM
9/3/2021 12:34 PM GUARDIAN CONSTRUCTION LP
building 6
Contact Name: GUARDIAN CONSTRUCTION LP
Site Address: 351 E VALPICO ROAD
Phone: 2098100828
e-Mail: miked@rubikbuilt.com
9/8/2021 6:51:28 AM
Building 6 underground plumbing approved
9/8/2021 7:21:30 AM
Building 6 underground plumbing approved
9/8/2021 7:44:26 AM
Building 6 underground plumbing approved
9/8/2021 8:03:26 AM
Building 6 underground plumbing approved
9/8/2021 8:09:11 AM
Building 6 underground plumbing approved
9/8/2021 8:13:18 AM
Building 6 underground plumbing approved
9/8/2021 8:13:30 AM
Building 6 underground plumbing approved
9/8/2021 8:15:06 AM
Building 6 underground plumbing approved
|
|
09/07/2021 | FOOTINGS / PIERS | SHAIN NIVEN | CORRECTION NOTICE | | 9/8/2021 3:23:07 PM
Rebar in footings, multiple locations require additional clearances.
Recall inspection when ready
|
|
09/07/2021 | SLAB | SHAIN NIVEN | CORRECTION NOTICE | eTRAKiT Inspection Request | 9/3/2021 12:33:29 PM
9/3/2021 12:33 PM GUARDIAN CONSTRUCTION LP
building 9 rebar
Contact Name: GUARDIAN CONSTRUCTION LP
Site Address: 351 E VALPICO ROAD
Phone: 2098100828
e-Mail: miked@rubikbuilt.com
9/8/2021 3:21:52 PM
Rebar in footings, multiple locations require additional clearances.
Recall inspection when ready
|
|
09/09/2021 | FOOTINGS / PIERS | SHAIN NIVEN | PARTIAL APPROVAL | | 9/9/2021 3:33:06 PM
Building 9 footings approved
|
|
09/09/2021 | SLAB | SHAIN NIVEN | PARTIAL APPROVAL | | 9/9/2021 3:33:23 PM
Building 9 slab approved
|
|
09/14/2021 | SLAB | SHAIN NIVEN | PARTIAL APPROVAL | eTRAKiT Inspection Request | 9/8/2021 1:00:41 PM
9/8/2021 1:00 PM GUARDIAN CONSTRUCTION LP
building 8 rebar
Contact Name: GUARDIAN CONSTRUCTION LP
Site Address: 351 E VALPICO ROAD
Phone: 2098100828
e-Mail: miked@rubikbuilt.com
9/14/2021 3:30:45 PM
Slab 8 approved, ok to proceed.
|
|
09/14/2021 | FLOOR DIAPHRAGM | SHAIN NIVEN | PARTIAL APPROVAL | eTRAKiT Inspection Request | 9/13/2021 3:12:51 PM
9/13/2021 3:12 PM GUARDIAN CONSTRUCTION LP
Building 07
Contact Name: GUARDIAN CONSTRUCTION LP
Site Address: 351 E VALPICO ROAD
Phone: 6692540198
e-Mail: jwoodbury@guardian-capital.com
9/14/2021 3:30:36 PM
shai changed Inspection Type from UNDER FLOOR FRAMING to FLOOR DIAPHRAGM
9/14/2021 3:38:38 PM
Building 7, remaining section of 1st floor diaphragm approved
Note: Some sections were partially covered due to walls being installed prior to benefit of complete inspection. Contractor was notified not to install walls to any floor diaphragm section that has not been inspected and approved.
|
|
09/14/2021 | FLOOR DIAPHRAGM | SHAIN NIVEN | PARTIAL APPROVAL | eTRAKiT Inspection Request | 9/13/2021 3:12:09 PM
9/13/2021 3:12 PM GUARDIAN CONSTRUCTION LP
Building 07
Contact Name: GUARDIAN CONSTRUCTION LP
Site Address: 351 E VALPICO ROAD
Phone: 6692540198
e-Mail: jwoodbury@guardian-capital.com
9/14/2021 3:30:38 PM
shai changed Inspection Type from UNDER FLOOR FRAMING to FLOOR DIAPHRAGM
9/14/2021 3:38:43 PM
Building 11 remaining section of 1st floor diaphragm approved
Note: Some sections were partially covered due to walls being installed prior to benefit of complete inspection. Contractor was notified not to install walls to any floor diaphragm section that has not been inspected and approved.
|
|
09/16/2021 | FLOOR DIAPHRAGM | SHAIN NIVEN | NOT READY | building 7 3rd lvl subfloor | 9/15/2021 1:28:56 PM
9/15/2021 1:28 PM GUARDIAN CONSTRUCTION LP
Contact Name: GUARDIAN CONSTRUCTION LP
Site Address: 351 E VALPICO ROAD
Phone: 2098100828
e-Mail: miked@rubikbuilt.com
|
|
| FLOOR DIAPHRAGM | | | BLDG 10 LVL3 subfloor | 9/15/2021 1:31:38 PM
9/15/2021 1:31 PM GUARDIAN CONSTRUCTION LP
Contact Name: GUARDIAN CONSTRUCTION LP
Site Address: 351 E VALPICO ROAD
Phone: 2098100828
e-Mail: miked@rubikbuilt.com
|
|
09/20/2021 | UNDERGROUND PLUMBING | SHAIN NIVEN | PARTIAL APPROVAL | building 5 | 9/15/2021 1:37:35 PM
9/15/2021 1:37 PM GUARDIAN CONSTRUCTION LP
Contact Name: GUARDIAN CONSTRUCTION LP
Site Address: 351 E VALPICO ROAD
Phone: 2098100828
e-Mail: miked@rubikbuilt.com
9/20/2021 4:07:18 PM
Building #5 underground plumbing approved, ok to cover
|
|
11/04/2021 | STORM DRAIN | SHAIN NIVEN | NOT READY | | |
|
11/04/2021 | UNDERGROUND PLUMBING | SHAIN NIVEN | NOT READY | | |
|
11/08/2021 | UNDERGROUND PLUMBING | RAMON VALENCIA | NOT READY | | |
|
11/08/2021 | STORM DRAIN | RAMON VALENCIA | NOT READY | | |
|
| STORM DRAIN | | | | |
|
| UNDERGROUND PLUMBING | | | | |
|
11/09/2021 | STORM DRAIN | SHAIN NIVEN | NOT READY | | |
|
11/09/2021 | UNDERGROUND PLUMBING | SHAIN NIVEN | CORRECTION NOTICE | | 11/9/2021 3:35:25 PM
Sewer pressure testing not ready. Have sewer pipes properly capped and test gauges ready prior to Inspectors arrival
|
|
11/15/2021 | UNDERGROUND PLUMBING | JAMES ALLISON | CANCELLED | | |
|
11/15/2021 | STORM DRAIN | JAMES ALLISON | CANCELLED | | |
|
11/24/2021 | STORM DRAIN | SHAIN NIVEN | NOT READY | Teichert Construction | 11/19/2021 10:03:50 AM
11/19/2021 10:03 AM GUARDIAN CONSTRUCTION LP
Testing out sewer, storm and water
Contact Name: GUARDIAN CONSTRUCTION LP
Site Address: 351 E VALPICO ROAD
Phone: 2096709587
e-Mail: vvillanueva@teichert.com
|
|
11/24/2021 | UNDER FLOOR PLUMBING | SHAIN NIVEN | PARTIAL APPROVAL | Teichert Construction | 11/19/2021 10:00:51 AM
11/19/2021 10:00 AM GUARDIAN CONSTRUCTION LP
Teichert Construction - Testing out sewer, storm and water
Contact Name: GUARDIAN CONSTRUCTION LP
Site Address: 351 E VALPICO ROAD
Phone: 2096709587
e-Mail: vvillanueva@teichert.com
11/22/2021 3:32:14 PM
shai changed Inspection Date/Time from 11/22/2021 PM to 11/23/2021
11/23/2021 7:01:19 AM
shai changed Inspection Date/Time from 11/22/2021 PM to 11/23/2021
11/24/2021 7:05:02 AM
Domestic water pressure test at west side of property, see highlighted plans for exact location
|
|
11/24/2021 | ELECTRIC SERVICE | SHAIN NIVEN | NOT READY | temp. power | 11/22/2021 3:41:34 PM
11/22/2021 3:41 PM GUARDIAN CONSTRUCTION LP
Contact Name: GUARDIAN CONSTRUCTION LP
Site Address: 351 E VALPICO ROAD
Phone: 6263915015
e-Mail: matt@rubikbuilt.com
|
|
11/24/2021 | FOOTINGS / PIERS | SHAIN NIVEN | CORRECTION NOTICE | Trash enclosures | 11/22/2021 3:36:48 PM
11/22/2021 3:36 PM GUARDIAN CONSTRUCTION LP
Contact Name: GUARDIAN CONSTRUCTION LP
Site Address: 351 E VALPICO ROAD
Phone: 6263915015
e-Mail: matt@rubikbuilt.com
11/24/2021 7:05:07 AM
Provide RFI for trash enclosure located at rear of property that is undermining the existing retaining walls foundation.
|
|
11/24/2021 | ELECTRIC SERVICE | SHAIN NIVEN | CANCELLED | eTRAKiT Inspection Request | 11/19/2021 3:10:12 PM
11/19/2021 3:10 PM GUARDIAN CONSTRUCTION LP
temp power meters
Contact Name: GUARDIAN CONSTRUCTION LP
Site Address: 351 E VALPICO ROAD
Phone: 209810028
e-Mail: miked@rubikbuilt.com
|
|
11/28/2021 | UNDERGROUND PLUMBING | SHAIN NIVEN | PARTIAL APPROVAL | Teichert Construction | 11/19/2021 10:03:50 AM
11/19/2021 10:03 AM GUARDIAN CONSTRUCTION LP
Testing out sewer, storm and water
Contact Name: GUARDIAN CONSTRUCTION LP
Site Address: 351 E VALPICO ROAD
Phone: 2096709587
e-Mail: vvillanueva@teichert.com
11/28/2021 4:34:41 PM
shai changed Inspection Type from UNDER FLOOR PLUMBING to UNDERGROUND PLUMBING
11/28/2021 4:35:58 PM
Sewer pressure test approved at areas marked on plans
|
|
12/02/2021 | UNDERGROUND PLUMBING | SHAIN NIVEN | PARTIAL APPROVAL | Scott Bruns Foreman Teichert Constructio | 11/29/2021 7:08:16 AM
11/29/2021 7:07 AM GUARDIAN CONSTRUCTION LP
Underground Testing
Contact Name: GUARDIAN CONSTRUCTION LP
Site Address: 351 E VALPICO ROAD
Phone: 2096709587
e-Mail: vvillanueva@teichert.com
12/1/2021 3:45:13 PM
shai changed Inspection Type from STORM DRAIN to UNDERGROUND PLUMBING
12/2/2021 7:21:02 AM
Sanitary sewer testing approved at building locations 1 , 6 and 7 / see highlighted plans for exact locations
|
|
12/02/2021 | UNDERGROUND PLUMBING | SHAIN NIVEN | PARTIAL APPROVAL | Scott Bruns Foreman Teichert Constructio | 11/29/2021 7:08:16 AM
11/29/2021 7:07 AM GUARDIAN CONSTRUCTION LP
Underground Testing
Contact Name: GUARDIAN CONSTRUCTION LP
Site Address: 351 E VALPICO ROAD
Phone: 2096709587
e-Mail: vvillanueva@teichert.com
12/2/2021 7:21:04 AM
Sanitary sewer testing approved at building location 8 and 9, see highlighted plans for exact location
|
|
12/06/2021 | STORM DRAIN | SHAIN NIVEN | NO ACCESS | eTRAKiT Inspection Request | 12/1/2021 8:46:27 AM
12/1/2021 8:46 AM GUARDIAN CONSTRUCTION LP
Teichert Construction
Underground Testing
Contact Name: Vanessa Villanueva
Site Address: 351 E Valpico Rd
Phone: 2096709587
e-Mail: vvillanueva@teichert.com
12/6/2021 3:58:05 PM
Contractor not onsite
|
|
12/07/2021 | FINAL PLUMBING** | SHAIN NIVEN | CANCELLED | Scott Bruns Foreman Teichert Constructio | 11/29/2021 7:08:16 AM
11/29/2021 7:07 AM GUARDIAN CONSTRUCTION LP
Underground Testing
Contact Name: GUARDIAN CONSTRUCTION LP
Site Address: 351 E VALPICO ROAD
Phone: 2096709587
e-Mail: vvillanueva@teichert.com
|
|
12/07/2021 | STORM DRAIN | SHAIN NIVEN | CANCELLED | Teichert Construction | 12/6/2021 1:48:21 PM
12/6/2021 1:48 PM GUARDIAN CONSTRUCTION LP
Undergroiund Inspection
Contact Name: Vanessa Villanueva
Site Address: 351 E Valpico Rd
Phone: 2096709587
e-Mail: vvillanueva@teichert.com
|
|
12/08/2021 | UNDERGROUND PLUMBING | SHAIN NIVEN | PARTIAL APPROVAL | Teichert Construction | 12/6/2021 1:48:21 PM
12/6/2021 1:48 PM GUARDIAN CONSTRUCTION LP
Undergroiund Inspection
Contact Name: Vanessa Villanueva
Site Address: 351 E Valpico Rd
Phone: 2096709587
e-Mail: vvillanueva@teichert.com
12/8/2021 3:50:23 PM
shai changed Inspection Type from UNDER FLOOR PLUMBING to UNDERGROUND PLUMBING
12/8/2021 4:12:32 PM
Completed underground sewer testing for all onsite sanitary sewer.
Carlos Garcia with city of Tracy inspected and approved force sewer main.
|
|
12/09/2021 | FOOTINGS / PIERS | SHAIN NIVEN | CORRECTION NOTICE | 2 of 3 Trash enclosures | 12/8/2021 10:44:19 AM
12/8/2021 10:44 AM GUARDIAN CONSTRUCTION LP
Contact Name: GUARDIAN CONSTRUCTION LP
Site Address: 351 E VALPICO ROAD
Phone: 6263915015
e-Mail: matt@rubikbuilt.com
12/9/2021 7:04:18 PM
Provide detailed plans for inspection of Trash enclosures
|
|
12/10/2021 | FOOTINGS / PIERS | SHAIN NIVEN | NOT READY | Trash enclosure footings | 12/9/2021 3:54:32 PM
12/9/2021 3:54 PM GUARDIAN CONSTRUCTION LP
Contact Name: GUARDIAN CONSTRUCTION LP
Site Address: 351 E VALPICO ROAD
Phone: 2098100828
e-Mail: miked@rubikbuilt.com
12/10/2021 3:10:46 PM
Contractor not onsite with plans.
|
|
12/20/2021 | FOOTINGS / PIERS | SHAIN NIVEN | CORRECTION NOTICE | trash enclosure footing | 12/15/2021 4:59:12 PM
12/15/2021 4:59 PM GUARDIAN CONSTRUCTION LP
Contact Name: GUARDIAN CONSTRUCTION LP
Site Address: 351 E VALPICO ROAD
Phone: 2098100828
e-Mail: miked@rubikbuilt.com
12/20/2021 7:06:21 AM
Footings for trash enclosures are full of water, remove water and reschedule inspection
|
|
12/20/2021 | FOOTINGS / PIERS | SHAIN NIVEN | PARTIAL APPROVAL | Trash enclosures | 12/17/2021 9:24:49 AM
12/17/2021 9:24 AM GUARDIAN CONSTRUCTION LP
Contact Name: GUARDIAN CONSTRUCTION LP
Site Address: 351 E VALPICO ROAD
Phone: 6263915015
e-Mail: matt@rubikbuilt.com
12/20/2021 4:20:20 PM
Trash enclosure footings approved.
RFI for trash enclosure at retaining wall received
|
|
02/18/2022 | 206-FIRE SPKR HYDRO | GLENDA THORNTON | APPROVED | Approved | 2/18/2022 2:14:27 PM
Two hour hydro approved. PSI 200 for two hours. Building 11
|
|
02/18/2022 | 206-FIRE SPKR HYDRO | GLENDA THORNTON | APPROVED | Approved | 2/18/2022 2:20:50 PM
Two hour hydro approved. PSI 200 for two hours. Building 12 Club House
|
|
01/03/2022 | 205-FIRE SPKR PIPE | GLENDA THORNTON | APPROVED | Approved | 2/18/2022 2:31:35 PM
All sprinkler pipe has been installed per preapproved plans.
|
|
02/18/2022 | 206-FIRE SPKR HYDRO | GLENDA THORNTON | APPROVED | Approved | 2/18/2022 2:32:15 PM
Two hour hydro approved. PSI 200 for two hours. Building 10
|
|
03/20/2022 | FOOTINGS / PIERS | SHAIN NIVEN | PARTIAL APPROVAL | | 3/20/2022 7:05:00 PM
(5) light standard footings approved
|
|
04/01/2022 | FOOTINGS / PIERS | SHAIN NIVEN | CORRECTION NOTICE | eTRAKiT Inspection Request | 3/31/2022 3:07:52 PM
3/31/2022 3:07 PM GUARDIAN CONSTRUCTION LP
Contact Name: GUARDIAN CONSTRUCTION LP
Site Address: 351 E VALPICO ROAD
Phone: 7609201200
e-Mail: jwoodbury@guardian-capital.com
4/1/2022 2:00:27 PM
Key way to be minimum 30" at transformer location
|
|
04/01/2022 | FOOTINGS / PIERS | SHAIN NIVEN | NOT READY | eTRAKiT Inspection Request | 3/30/2022 2:50:10 PM
3/30/2022 2:49 PM GUARDIAN CONSTRUCTION LP
Contact Name: GUARDIAN CONSTRUCTION LP
Site Address: 351 E VALPICO ROAD
Phone: 7609201200
e-Mail: jwoodbury@guardian-capital.com
|
|
04/04/2022 | FOOTINGS / PIERS | SHAIN NIVEN | PARTIAL APPROVAL | eTRAKiT Inspection Request | 4/3/2022 5:42:49 PM
4/3/2022 5:42 PM GUARDIAN CONSTRUCTION LP
Contact Name: GUARDIAN CONSTRUCTION LP
Site Address: 351 E VALPICO ROAD
Phone: 7609201200
e-Mail: jwoodbury@guardian-capital.com
4/4/2022 3:35:13 PM
Footings for retaining wall at clubhouse / pool area approved
|
|
06/07/2022 | FOOTINGS / PIERS | SHAIN NIVEN | PARTIAL APPROVAL | eTRAKiT Inspection Request | 6/6/2022 1:55:44 PM
6/6/2022 1:55 PM GUARDIAN CONSTRUCTION LP
parking structures
Contact Name: GUARDIAN CONSTRUCTION LP
Site Address: 351 E VALPICO ROAD
Phone: 7609201200
e-Mail: jwoodbury@guardian-capital.com
6/7/2022 6:37:04 PM
Footings for parking structures
|
|
06/15/2022 | MASONRY/BLOCK WALL | JAMES ALLISON | PARTIAL APPROVAL | eTRAKiT Inspection Request | 6/13/2022 12:22:14 PM
6/13/2022 12:22 PM GUARDIAN CONSTRUCTION LP
Contact Name: GUARDIAN CONSTRUCTION LP
Site Address: 351 E VALPICO ROAD
Phone: 7609201200
e-Mail: eric@rubikbuilt.com
6/15/2022 9:00:11 AM
Second lift for three trash enclosures ok
|
|
06/22/2022 | FOOTINGS / PIERS | SHAIN NIVEN | PARTIAL APPROVAL | eTRAKiT Inspection Request | 6/21/2022 12:43:17 PM
6/21/2022 12:43 PM GUARDIAN CONSTRUCTION LP
Contact Name: GUARDIAN CONSTRUCTION LP
Site Address: 351 E VALPICO ROAD
Phone: 7609201200
e-Mail: eric@rubikbuilt.com
6/22/2022 4:11:22 PM
Footings for carports between buildings 5,6,8 and 9 approved
|
|
06/23/2022 | FOOTINGS / PIERS | SHAIN NIVEN | PARTIAL APPROVAL | eTRAKiT Inspection Request | 6/22/2022 2:17:16 PM
6/22/2022 2:17 PM GUARDIAN CONSTRUCTION LP
Contact Name: GUARDIAN CONSTRUCTION LP
Site Address: 351 E VALPICO ROAD
Phone: 7609201200
e-Mail: eric@rubikbuilt.com
6/23/2022 3:56:13 PM
Footings for Carports in front of building 10 approved
|
|
07/08/2022 | FOOTINGS / PIERS | SHAIN NIVEN | CORRECTION NOTICE | eTRAKiT Inspection Request | 7/4/2022 11:11:59 AM
7/4/2022 11:11 AM GUARDIAN CONSTRUCTION LP
Contact Name: GUARDIAN CONSTRUCTION LP
Site Address: 351 E VALPICO ROAD
Phone: 7609201200
e-Mail: eric@rubikbuilt.com
7/8/2022 7:26:45 AM
Provide stamped/ approved plans for review at time of inspection
|
|
07/14/2022 | FOOTINGS / PIERS | SHAIN NIVEN | NOT READY | eTRAKiT Inspection Request | 7/7/2022 2:35:05 PM
7/7/2022 2:34 PM GUARDIAN CONSTRUCTION LP
Contact Name: GUARDIAN CONSTRUCTION LP
Site Address: 351 E VALPICO ROAD
Phone: 7609201200
e-Mail: eric@rubikbuilt.com
|
|
07/16/2022 | MASONRY/BLOCK WALL | SHAIN NIVEN | PARTIAL APPROVAL | eTRAKiT Inspection Request | 7/13/2022 1:29:54 PM
7/13/2022 1:29 PM GUARDIAN CONSTRUCTION LP
Contact Name: GUARDIAN CONSTRUCTION LP
Site Address: 351 E VALPICO ROAD
Phone: 7609201200
e-Mail: eric@rubikbuilt.com
7/16/2022 10:20:37 AM
1st lift approved at own risk ( plan approval is pending) CMU wall at pool.
|
|
07/16/2022 | MASONRY/BLOCK WALL | SHAIN NIVEN | NOT READY | eTRAKiT Inspection Request | 7/12/2022 2:18:12 PM
7/12/2022 2:18 PM GUARDIAN CONSTRUCTION LP
Contact Name: GUARDIAN CONSTRUCTION LP
Site Address: 351 E VALPICO ROAD
Phone: 7609201200
e-Mail: eric@rubikbuilt.com
|
|
07/16/2022 | FOOTINGS / PIERS | SHAIN NIVEN | PARTIAL APPROVAL | eTRAKiT Inspection Request | 7/12/2022 2:18:12 PM
7/12/2022 2:18 PM GUARDIAN CONSTRUCTION LP
Contact Name: GUARDIAN CONSTRUCTION LP
Site Address: 351 E VALPICO ROAD
Phone: 7609201200
e-Mail: eric@rubikbuilt.com
7/16/2022 10:24:53 AM
Footings for CMU pool fence approved to proceed at builders own risk, formal approval pending plan check approval.
|
|
07/17/2022 | FOOTINGS / PIERS | SHAIN NIVEN | PARTIAL APPROVAL | eTRAKiT Inspection Request | 7/13/2022 1:29:54 PM
7/13/2022 1:29 PM GUARDIAN CONSTRUCTION LP
Contact Name: GUARDIAN CONSTRUCTION LP
Site Address: 351 E VALPICO ROAD
Phone: 7609201200
e-Mail: eric@rubikbuilt.com
|
|
07/18/2022 | 206-FIRE SPKR HYDRO | GLENDA THORNTON | APPROVED | Approved | 7/18/2022 5:55:39 PM
Two hour hydro approved or building 4 PSI 200 for two hours.
Sprinkler have been installed according to the pre approved plans
|
|
07/18/2022 | 205-FIRE SPKR PIPE | GLENDA THORNTON | APPROVED | Approved | 7/18/2022 5:57:24 PM
The fire sprinkler rough for building 4 is approved per pre approved plans. No leaks when the building was under hydro test.
|
|
07/19/2022 | MASONRY/BLOCK WALL | SHAIN NIVEN | PARTIAL APPROVAL | eTRAKiT Inspection Request | 7/18/2022 7:58:46 PM
7/18/2022 7:58 PM GUARDIAN CONSTRUCTION LP
Contact Name: GUARDIAN CONSTRUCTION LP
Site Address: 351 E VALPICO ROAD
Phone: 7609201200
e-Mail: eric@rubikbuilt.com
7/19/2022 4:14:38 PM
High lift at south side of pool wall and 2nd lift at East side pool wall approved, ok to proceed at own risk / final approval pending plan check approval, any corrections to submitted plans will be at owner/builders expense
|
|
07/22/2022 | FOOTINGS / PIERS | SHAIN NIVEN | CORRECTION NOTICE | eTRAKiT Inspection Request | 7/21/2022 3:21:59 PM
7/21/2022 3:21 PM GUARDIAN CONSTRUCTION LP
Contact Name: GUARDIAN CONSTRUCTION LP
Site Address: 351 E VALPICO ROAD
Phone: 7609201200
e-Mail: eric@rubikbuilt.com
7/22/2022 1:46:01 PM
Footings at retaining/ pool wall next to mail boxes not built per plans.
7/22/2022 9:46:19 PM
Footings at retaining/ pool wall next to mail boxes not built per plans.
|
|
07/25/2022 | FOOTINGS / PIERS | SHAIN NIVEN | NOT READY | eTRAKiT Inspection Request | 7/22/2022 11:08:10 AM
7/22/2022 11:08 AM GUARDIAN CONSTRUCTION LP
Contact Name: GUARDIAN CONSTRUCTION LP
Site Address: 351 E VALPICO ROAD
Phone: 7609201200
e-Mail: eric@rubikbuilt.com
|
|
| FOOTINGS / PIERS | | | eTRAKiT Inspection Request | 7/26/2022 12:44:31 PM
7/26/2022 12:44 PM GUARDIAN CONSTRUCTION LP
Contact Name: GUARDIAN CONSTRUCTION LP
Site Address: 351 E VALPICO ROAD
Phone: 7609201200
e-Mail: eric@rubikbuilt.com
|
|
07/27/2022 | FOOTINGS / PIERS | SHAIN NIVEN | NOT READY | eTRAKiT Inspection Request | 7/25/2022 2:22:13 PM
7/25/2022 2:22 PM GUARDIAN CONSTRUCTION LP
Contact Name: GUARDIAN CONSTRUCTION LP
Site Address: 351 E VALPICO ROAD
Phone: 7609201200
e-Mail: eric@rubikbuilt.com
|
|
08/02/2022 | FOOTINGS / PIERS | SHAIN NIVEN | NOT READY | eTRAKiT Inspection Request | 8/1/2022 3:12:38 PM
8/1/2022 3:12 PM GUARDIAN CONSTRUCTION LP
Contact Name: GUARDIAN CONSTRUCTION LP
Site Address: 351 E VALPICO ROAD
Phone: 7609201200
e-Mail: eric@rubikbuilt.com
|
|
08/03/2022 | FOOTINGS / PIERS | SHAIN NIVEN | PARTIAL APPROVAL | eTRAKiT Inspection Request | 8/2/2022 2:27:14 PM
8/2/2022 2:27 PM GUARDIAN CONSTRUCTION LP
Contact Name: GUARDIAN CONSTRUCTION LP
Site Address: 351 E VALPICO ROAD
Phone: 7609201200
e-Mail: eric@rubikbuilt.com
8/3/2022 9:13:37 PM
Retaining wall at north side of pool and clubhouse location approved to proceed at own risk. Submitted Plans have not been approved at time of requested inspection.
|
|
08/04/2022 | FOOTINGS / PIERS | SHAIN NIVEN | NOT READY | eTRAKiT Inspection Request | 8/3/2022 4:45:55 PM
8/3/2022 4:46 PM GUARDIAN CONSTRUCTION LP
Contact Name: GUARDIAN CONSTRUCTION LP
Site Address: 351 E VALPICO ROAD
Phone: 7609201200
e-Mail: eric@rubikbuilt.com
|
|
08/08/2022 | FOOTINGS / PIERS | SHAIN NIVEN | PARTIAL APPROVAL | eTRAKiT Inspection Request | 8/7/2022 4:52:10 PM
8/7/2022 4:52 PM GUARDIAN CONSTRUCTION LP
Contact Name: GUARDIAN CONSTRUCTION LP
Site Address: 351 E VALPICO ROAD
Phone: 7609201200
e-Mail: eric@rubikbuilt.com
8/8/2022 2:36:25 PM
Concrete stem footing wall at pool location approved.
|
|
08/08/2022 | FOOTINGS / PIERS | SHAIN NIVEN | CANCELLED | eTRAKiT Inspection Request | 8/5/2022 5:54:14 PM
8/5/2022 5:54 PM GUARDIAN CONSTRUCTION LP
Contact Name: GUARDIAN CONSTRUCTION LP
Site Address: 351 E VALPICO ROAD
Phone: 7609201200
e-Mail: eric@rubikbuilt.com
|
|
08/10/2022 | 205-FIRE SPKR PIPE | GLENDA THORNTON | APPROVED | Approved | 8/10/2022 11:14:41 AM
The sprinkler rough for building 3 has been approved per pre approved plans.
|
|
08/10/2022 | 206-FIRE SPKR HYDRO | GLENDA THORNTON | APPROVED | Approved | 8/10/2022 11:15:52 AM
The two hour hydro for building 3 approved 200 PSI for two hours.
|
|
08/11/2022 | FOOTINGS / PIERS | SHAIN NIVEN | CORRECTION NOTICE | eTRAKiT Inspection Request | 8/10/2022 12:36:31 PM
8/10/2022 12:36 PM GUARDIAN CONSTRUCTION LP
Contact Name: GUARDIAN CONSTRUCTION LP
Site Address: 351 E VALPICO ROAD
Phone: 7609201200
e-Mail: eric@rubikbuilt.com
8/11/2022 1:27:14 PM
Light standard at pool/ mail box location inspected. Footing and rebar approved.
Provide detail for required J-bolts and install ground rod with 4AWG wire to rebar cage as per approved plans.
|
|
08/15/2022 | POOL PRE-DECK | SHAIN NIVEN | APPROVED | eTRAKiT Inspection Request | 8/10/2022 12:32:00 PM
8/10/2022 12:32 PM GUARDIAN CONSTRUCTION LP
Contact Name: GUARDIAN CONSTRUCTION LP
Site Address: 351 E VALPICO ROAD
Phone: 7609201200
e-Mail: eric@rubikbuilt.com
8/11/2022 1:27:17 PM
shai changed Inspection Type from UNDERGROUND ELECTRICAL to POOL PRE-DECK
8/15/2022 5:57:21 PM
Pool decking ( concrete) was installed without benefit of complete inspection of equipotential bonding.
A continuity test was performed for all handrails, chair lifts and pool motor locations, all locations showed continuity between all required bonding locations.
|
|
08/15/2022 | MASONRY/BLOCK WALL | SHAIN NIVEN | PARTIAL APPROVAL | eTRAKiT Inspection Request | 8/9/2022 2:32:43 PM
8/9/2022 2:32 PM GUARDIAN CONSTRUCTION LP
Contact Name: GUARDIAN CONSTRUCTION LP
Site Address: 351 E VALPICO ROAD
Phone: 7609201200
e-Mail: eric@rubikbuilt.com
8/15/2022 5:57:23 PM
Retaining wall at pool location approved / pending formal approval of submitted plans
|
|
08/18/2022 | FOOTINGS / PIERS | SHAIN NIVEN | CORRECTION NOTICE | eTRAKiT Inspection Request | 8/17/2022 5:32:58 PM
8/17/2022 5:33 PM GUARDIAN CONSTRUCTION LP
Contact Name: GUARDIAN CONSTRUCTION LP
Site Address: 351 E VALPICO ROAD
Phone: 7609201200
e-Mail: eric@rubikbuilt.com
8/18/2022 3:39:25 PM
Piers for light standards at club house location not ready.
|
|
08/19/2022 | FOOTINGS / PIERS | JAMES ALLISON | PARTIAL APPROVAL | eTRAKiT Inspection Request | 8/18/2022 2:45:25 PM
8/18/2022 2:45 PM GUARDIAN CONSTRUCTION LP
Contact Name: GUARDIAN CONSTRUCTION LP
Site Address: 351 E VALPICO ROAD
Phone: 7609201200
e-Mail: eric@rubikbuilt.com
8/19/2022 9:30:13 AM
Three light standard footings at clubhouse ok to pour
|
|
08/25/2022 | FOOTINGS / PIERS | SHAIN NIVEN | PARTIAL APPROVAL | eTRAKiT Inspection Request | 8/23/2022 5:56:41 PM
8/23/2022 5:56 PM GUARDIAN CONSTRUCTION LP
Contact Name: GUARDIAN CONSTRUCTION LP
Site Address: 351 E VALPICO ROAD
Phone: 7609201200
e-Mail: eric@rubikbuilt.com
8/25/2022 3:42:30 PM
Piers for Side walk lighting behind building 7 approved
|
|
09/07/2022 | 205-FIRE SPKR PIPE | GLENDA THORNTON | APPROVED | Approved | 9/7/2022 9:42:47 AM
GLENDA THORNTON
Fire sprinkler rough for building two approved.
|
|
09/07/2022 | 206-FIRE SPKR HYDRO | GLENDA THORNTON | APPROVED | Approved | 9/7/2022 9:43:46 AM
Two hour hydro for building two approved PSI 200 for two hours
|
|
09/14/2022 | POOL PRE-PLASTER | SHAIN NIVEN | CORRECTION NOTICE | eTRAKiT Inspection Request | 9/13/2022 4:42:10 PM
9/13/2022 4:42 PM GUARDIAN CONSTRUCTION LP
Contact Name: GUARDIAN CONSTRUCTION LP
Site Address: 351 E VALPICO ROAD
Phone: 7609201200
e-Mail: eric@rubikbuilt.com
9/14/2022 3:33:14 PM
Provide approval from Health services prior to proceeding with Plaster.
|
|
09/14/2022 | FOOTINGS / PIERS | SHAIN NIVEN | CORRECTION NOTICE | eTRAKiT Inspection Request | 9/13/2022 4:42:10 PM
9/13/2022 4:42 PM GUARDIAN CONSTRUCTION LP
Contact Name: GUARDIAN CONSTRUCTION LP
Site Address: 351 E VALPICO ROAD
Phone: 7609201200
e-Mail: eric@rubikbuilt.com
9/14/2022 3:33:17 PM
Inspected (2) footings for trash enclosures next to buildings #1 and #3. Install rebar at F3 locations per approved plans.
|
|
09/20/2022 | FOOTINGS / PIERS | SHAIN NIVEN | PARTIAL APPROVAL | eTRAKiT Inspection Request | 9/19/2022 9:23:09 PM
9/19/2022 9:23 PM GUARDIAN CONSTRUCTION LP
Contact Name: GUARDIAN CONSTRUCTION LP
Site Address: 351 E VALPICO ROAD
Phone: 7609201200
e-Mail: eric@rubikbuilt.com
9/20/2022 4:49:52 PM
Footings for trash enclosures at building #1 and #3 approved, ok to proceed
|
|
09/21/2022 | 205-FIRE SPKR PIPE | GLENDA THORNTON | APPROVED | Approved | 9/21/2022 9:42:56 AM
The sprinkler rough inspection is approved per pre approved plans on site.
For building 1
|
|
09/21/2022 | 206-FIRE SPKR HYDRO | GLENDA THORNTON | APPROVED | Approved | 9/21/2022 9:45:25 AM
The two hour hydro for building 1 is approved 200 PSI for two hours.
|
|
10/04/2022 | FOOTINGS / PIERS | SHAIN NIVEN | CORRECTION NOTICE | eTRAKiT Inspection Request | 10/3/2022 7:48:20 PM
10/3/2022 7:48 PM GUARDIAN CONSTRUCTION LP
Contact Name: GUARDIAN CONSTRUCTION LP
Site Address: 351 E VALPICO ROAD
Phone: 7609201200
e-Mail: eric@rubikbuilt.com
10/4/2022 3:44:31 PM
Footings (4) and rebar cages for Shade structure next to mail boxes inspected
Ok to proceed with concrete placement at builders own risk, formal approval pending city plan check review and approval of as built condition.
|
|
10/11/2022 | FOOTINGS / PIERS | JOHN CAMPANILE | NOT READY | eTRAKiT Inspection Request | 10/10/2022 8:17:53 PM
10/10/2022 8:17 PM GUARDIAN CONSTRUCTION LP
Contact Name: GUARDIAN CONSTRUCTION LP
Site Address: 351 E VALPICO ROAD
Phone: 7609201200
e-Mail: eric@rubikbuilt.com
|
|
10/12/2022 | FOOTINGS / PIERS | JOHN CAMPANILE | PARTIAL APPROVAL | eTRAKiT Inspection Request | 10/11/2022 8:13:40 PM
10/11/2022 8:13 PM GUARDIAN CONSTRUCTION LP
Contact Name: GUARDIAN CONSTRUCTION LP
Site Address: 351 E VALPICO ROAD
Phone: 7609201200
e-Mail: eric@rubikbuilt.com
10/12/2022 2:46:05 PM
1: Light pole footing at mailboxes Ok to pour.
|
|
10/13/2022 | FOOTINGS / PIERS | SHAIN NIVEN | NOT READY | eTRAKiT Inspection Request | 10/12/2022 7:12:18 PM
10/12/2022 7:12 PM GUARDIAN CONSTRUCTION LP
Contact Name: GUARDIAN CONSTRUCTION LP
Site Address: 351 E VALPICO ROAD
Phone: 7609201200
e-Mail: eric@rubikbuilt.com
|
|
10/22/2022 | FOOTINGS / PIERS | SHAIN NIVEN | CORRECTION NOTICE | eTRAKiT Inspection Request | 10/19/2022 2:47:42 PM
10/19/2022 2:47 PM GUARDIAN CONSTRUCTION LP
Contact Name: GUARDIAN CONSTRUCTION LP
Site Address: 351 E VALPICO ROAD
Phone: 7609201200
e-Mail: eric@rubikbuilt.com
10/22/2022 8:56:54 PM
Inspected 3 light pole bases. Piers and/or rebar not installed per plans.
Repair and recall inspections
|
|
10/22/2022 | MASONRY/BLOCK WALL | SHAIN NIVEN | PARTIAL APPROVAL | eTRAKiT Inspection Request | 10/19/2022 2:46:20 PM
10/19/2022 2:46 PM GUARDIAN CONSTRUCTION LP
phase 3 by buildings 1 and 3
Contact Name: GUARDIAN CONSTRUCTION LP
Site Address: 351 E VALPICO ROAD
Phone: 7609201200
e-Mail: eric@rubikbuilt.com
10/22/2022 8:56:57 PM
Trash enclosure CMU walls approved building 1 and 3 locations
|
|
10/22/2022 | FOOTINGS / PIERS | SHAIN NIVEN | CANCELLED | eTRAKiT Inspection Request | 10/18/2022 3:00:34 PM
10/18/2022 3:00 PM GUARDIAN CONSTRUCTION LP
Contact Name: GUARDIAN CONSTRUCTION LP
Site Address: 351 E VALPICO ROAD
Phone: 7609201200
e-Mail: eric@rubikbuilt.com
|
|
10/25/2022 | FOOTINGS / PIERS | SHAIN NIVEN | NOT READY | eTRAKiT Inspection Request | 10/21/2022 12:22:13 PM
10/21/2022 12:22 PM GUARDIAN CONSTRUCTION LP
Contact Name: GUARDIAN CONSTRUCTION LP
Site Address: 351 E VALPICO ROAD
Phone: 7609201200
e-Mail: eric@rubikbuilt.com
|
|
10/25/2022 | FOOTINGS / PIERS | SHAIN NIVEN | PARTIAL APPROVAL | eTRAKiT Inspection Request | 10/24/2022 6:53:20 PM
10/24/2022 6:53 PM GUARDIAN CONSTRUCTION LP
Contact Name: GUARDIAN CONSTRUCTION LP
Site Address: 351 E VALPICO ROAD
Phone: 7609201200
e-Mail: eric@rubikbuilt.com
10/25/2022 3:59:21 PM
(9) Piers for light standards located at park area next to building (7) approved
|
|
10/27/2022 | 225-FIRE FINAL BP | GLENDA THORNTON | CORRECTION NOTICE | Correction Notice | 10/27/2022 5:06:49 PM
Building 7 Fire Alarm
All devices have been tested and verified in the FACP and dispatch.
The 24 hour battery test was completed with a 5 min ring out.
The fire alarm system has been installed per pre approved plans
The calc plates need to have the correct building number on them.
The PIV and OS&Y need break away locks installed.
Signs on the PIV and FDC will need to be installed.
|
|
10/27/2022 | 225-FIRE FINAL BP | GLENDA THORNTON | CORRECTION NOTICE | Correction Notice | 10/27/2022 5:08:26 PM
Building 10 Fire Alarm
All devices have been tested and verified in the FACP and dispatch.
The 24 hour battery test was completed with a 5 min ring out.
The fire alarm system has been installed per pre approved plans
The calc plates need to have the correct building number on them.
The PIV and OS&Y need break away locks installed.
Signs on the PIV and FDC will need to be installed.
|
|
10/27/2022 | 225-FIRE FINAL BP | GLENDA THORNTON | CORRECTION NOTICE | Correction Notice | 10/27/2022 5:11:36 PM
Building 7 fire sprinklers
: All sprinkler heads have been installed per approved plans.
All smoke detectors have been tested and approved.
The extra sprinkler head box has been installed.
The sprinkler calc plate needs to have the correct building number on it.
Master key will need to be installed in the Knox box
|
|
10/27/2022 | 225-FIRE FINAL BP | GLENDA THORNTON | CORRECTION NOTICE | Correction Notice | 10/27/2022 5:13:00 PM
: All sprinkler heads have been installed per approved plans.
All smoke detectors have been tested and approved.
The extra sprinkler head box has been installed.
The sprinkler calc plate needs to have the correct building number on it.
Master key will need to be installed in the Knox box
|
|
10/27/2022 | 224-FIRE TCO BP | GLENDA THORNTON | CORRECTION NOTICE | Correction Notice | 10/27/2022 5:15:24 PM
TCO plan will need to be submitted to the building department and to fire for approval.
The Knox box keys will need to be installed.
The locking FDC caps will need to be installed.
Duel access will need to be available.
Emergency lights need to be operating properly.
|
|
10/31/2022 | FOOTINGS / PIERS | SHAIN NIVEN | CANCELLED | eTRAKiT Inspection Request | 10/30/2022 12:08:29 PM
10/30/2022 12:08 PM GUARDIAN CONSTRUCTION LP
Contact Name: GUARDIAN CONSTRUCTION LP
Site Address: 351 E VALPICO ROAD
Phone: 7609201200
e-Mail: eric@rubikbuilt.com
|
|
11/07/2022 | FOOTINGS / PIERS | SHAIN NIVEN | PARTIAL APPROVAL | eTRAKiT Inspection Request | 11/2/2022 1:21:33 PM
11/2/2022 1:21 PM GUARDIAN CONSTRUCTION LP
Contact Name: GUARDIAN CONSTRUCTION LP
Site Address: 351 E VALPICO ROAD
Phone: 7609201200
e-Mail: eric@rubikbuilt.com
11/7/2022 4:01:14 PM
Lighting standards at units 6,7,8,9 approved
|
|
11/13/2022 | FINAL ACCESSIBILITY | SHAIN NIVEN | NOT READY | eTRAKiT Inspection Request | 11/4/2022 9:30:53 AM
11/4/2022 9:30 AM GUARDIAN CONSTRUCTION LP
Contact Name: GUARDIAN CONSTRUCTION LP
Site Address: 351 E VALPICO ROAD
Phone: 7609201200
e-Mail: eric@rubikbuilt.com
11/7/2022 3:11:04 PM
shai changed Inspection Date/Time from 11/07/2022 to 11/08/2022
|
|
11/16/2022 | 209-FIRE ALRM FIN** | GLENDA THORNTON | APPROVED | Approved | 11/16/2022 6:29:06 PM
The 24 hour battery test was conducted and approved, all installed devices have been tested and verified on the FACP and through dispatch. All signage has been installed for this building, keys have been installed in the Knoxbox.
F21-0450
|
|
11/16/2022 | 224-FIRE TCO BP | GLENDA THORNTON | APPROVED | Approved | 11/16/2022 6:16:19 PM
All fire and life safety systems have been tested and approved for TCO for building 9
|
|
11/16/2022 | 209-FIRE ALRM FIN** | GLENDA THORNTON | APPROVED | Approved | 11/16/2022 6:29:50 PM
The 24 hour battery test was conducted and approved, all installed devices have been tested and verified on the FACP and through dispatch. All signage has been installed for this building, keys have been installed in the Knoxbox. Building 11F21-0369
|
|
11/16/2022 | 207-FIRE SPKR FINAL* | GLENDA THORNTON | APPROVED | Approved | 11/16/2022 6:28:32 PM
The fire sprinkler final is approved per pre approved plans.
F21-0439
|
|
11/16/2022 | 207-FIRE SPKR FINAL* | GLENDA THORNTON | APPROVED | Approved | 11/16/2022 7:01:53 PM
Fire sprinkler final for building 11 approved.
|
|
11/30/2022 | FOOTINGS / PIERS | SHAIN NIVEN | PARTIAL APPROVAL | | 11/30/2022 3:30:06 PM
Footings for Retaining walls at buildings 1, 5 and 8 approved
|
|
12/09/2022 | 224-FIRE TCO BP | DAN STOWE | CORRECTION NOTICE | Bldg 8 | 12/9/2022 3:14:25 PM
Fire caulking in both the fire control room and electrical room needs to be applied. Knox FDC caps are required for all
PIV's. Fire sprinkler permit shall be signed off prior to fire final. Call for re-inspection
|
|
12/16/2022 | 224-FIRE TCO BP | DAN STOWE | APPROVED | BLDG 8 | 12/16/2022 1:18:07 PM
All outstanding fire corrections have been inspected and approved. All Fire and Life Safety Systems have been finaled. 90 minute e-test passed.
|
|
12/21/2022 | FINAL ACCESSIBILITY | SHAIN NIVEN | CANCELLED | eTRAKiT Inspection Request | |
|
01/18/2023 | FINAL ACCESSIBILITY | SHAIN NIVEN | CORRECTION NOTICE | eTRAKiT Inspection Request | 1/17/2023 3:57:05 PM
1/17/2023 3:57 PM GUARDIAN CONSTRUCTION LP
Contact Name: GUARDIAN CONSTRUCTION LP
Site Address: 351 E VALPICO RD
Phone: 7609201200
e-Mail: jwoodbury@guardian-capital.com
1/18/2023 4:00:35 PM
Curb ramps on accessible routes require grooved borders as per CBC 1112A.8
Not a complete inspection / additional corrections may follow
|
|
01/23/2023 | FOOTINGS / PIERS | SHAIN NIVEN | PARTIAL APPROVAL | eTRAKiT Inspection Request | 1/20/2023 3:29:07 PM
1/20/2023 3:29 PM GUARDIAN CONSTRUCTION LP
Carport footings
Contact Name: GUARDIAN CONSTRUCTION LP
Site Address: 351 E VALPICO RD
Phone: 7609201200
e-Mail: jwoodbury@guardian-capital.com
1/23/2023 3:33:35 PM
4 piers approved at N/E side of building 5, ok to proceed with concrete.
|
|
01/24/2023 | FOOTINGS / PIERS | SHAIN NIVEN | PARTIAL APPROVAL | eTRAKiT Inspection Request | 1/23/2023 3:34:53 PM
1/23/2023 3:34 PM GUARDIAN CONSTRUCTION LP
Carport footings
Contact Name: GUARDIAN CONSTRUCTION LP
Site Address: 351 E VALPICO RD
Phone: 7609201200
e-Mail: jwoodbury@guardian-capital.com
1/24/2023 3:01:25 PM
Footings for carports at the west side of buildings 1 and 2 approved
|
|
01/26/2023 | FOOTINGS / PIERS | SHAIN NIVEN | PARTIAL APPROVAL | eTRAKiT Inspection Request | 1/25/2023 12:45:45 PM
1/25/2023 12:45 PM GUARDIAN CONSTRUCTION LP
Carport footings
Contact Name: GUARDIAN CONSTRUCTION LP
Site Address: 351 E VALPICO RD
Phone: 7609201200
e-Mail: jwoodbury@guardian-capital.com
1/26/2023 3:51:56 PM
Spread footings for Carports at Building 5 approved
|
|
01/31/2023 | 205-FIRE SPKR PIPE | GLENDA THORNTON | CORRECTION NOTICE | Correction Notice Bld 5 | 1/31/2023 2:22:17 PM
Bld 5
The sprinkler heads need to be installed in the outdoor hallways on all three floors.
Replace the painted sprinkler head in 528.
Unit 532 sprinkler needs to be finished.
|
|
01/31/2023 | 225-FIRE FINAL BP | GLENDA THORNTON | APPROVED | Approved FA Bld 5 | 1/31/2023 2:35:13 PM
The fire alarm for building 5 is finale and approved. The 24 hour battery test and 5 min ring out is completed and approved. All installed devices per pre approved plans were tested and verified at the FACP and through dispatch call back.
|
|
02/02/2023 | 225-FIRE FINAL BP | GLENDA THORNTON | APPROVED | Approved Bld 6 | 2/2/2023 2:48:07 PM
TCO for building 6 approved
|
|
02/09/2023 | 225-FIRE FINAL BP | GLENDA THORNTON | APPROVED | Approved | 2/9/2023 4:56:50 PM
Fire sprinklers approved for the TO according to pre approved plans.
|
|
02/13/2023 | FOOTINGS / PIERS | SHAIN NIVEN | CORRECTION NOTICE | eTRAKiT Inspection Request | 2/7/2023 3:11:45 PM
2/7/2023 3:11 PM GUARDIAN CONSTRUCTION LP
Contact Name: GUARDIAN CONSTRUCTION LP
Site Address: 351 E VALPICO RD
Phone: 7609201200
e-Mail: jwoodbury@guardian-capital.com
2/8/2023 7:51:53 PM
shai changed Inspection Date/Time from 02/08/2023 AM to 02/09/2023
2/13/2023 3:04:06 PM
Canopy at (2) locations park and next to building 4 / Posts have been installed without approved plans or benefit of pier and rebar inspection
Provide approved set of plans for review prior to requesting inspections
|
|
02/14/2023 | 164-RED TAG | SHAIN NIVEN | WRONG INSP. TYPE | | |
|
02/14/2023 | 164-RED TAG | SHAIN NIVEN | WRONG INSP. TYPE | | |
|
02/16/2023 | FINAL ACCESSIBILITY | SHAIN NIVEN | CANCELLED | | 2/8/2023 7:51:51 PM
shai changed Inspection Date/Time from 02/08/2023 to 02/09/2023
2/13/2023 7:52:32 PM
shai changed Inspection Date/Time from 02/09/2023 to 02/14/2023
2/14/2023 1:54:23 PM
shai changed Inspection Date/Time from 02/14/2023 to 02/15/2023
2/15/2023 3:14:51 PM
shai changed Inspection Date/Time from 02/15/2023 to 02/16/2023
|
|
02/21/2023 | 225-FIRE FINAL BP | GLENDA THORNTON | APPROVED | F22-0079 | 2/21/2023 3:41:09 PM
The fire sprinkler final has been approved, once the fees have been paid the permit can be closed.
|
|
02/22/2023 | 225-FIRE FINAL BP | GLENDA THORNTON | CORRECTION NOTICE | F22-0078 | 2/22/2023 2:53:07 PM
Units 314 317 and the entry way need to have the gaps filled around the escutcheon plates.
|
|
02/28/2023 | 224-FIRE TCO BP | GLENDA THORNTON | APPROVED | F19-0015 BLD 4 | 2/28/2023 4:06:23 PM
The fire alarm company has programed building 4 PIV and OS&Y into the main fire alarm control panel in the club house.
|
|
03/30/2023 | 225-FIRE FINAL BP | GLENDA THORNTON | APPROVED | Building 1 FS | 3/30/2023 12:09:17 PM
Fire final approved per pre approved plans.
|
|
03/30/2023 | 225-FIRE FINAL BP | GLENDA THORNTON | APPROVED | Building 2 FS | 3/30/2023 12:22:48 PM
Final fire sprinkler inspection approved per pre approved plans.
|
|
03/30/2023 | 225-FIRE FINAL BP | GLENDA THORNTON | CORRECTION NOTICE | Building 1 Fire Final | 3/30/2023 12:44:10 PM
The Knox box will need to be installed and the main key to the building and electrical room will need to be installed.
The fire alarm company will need to reprogram the FACP to reflect building 1 and 2 are connected to the PIV and OS&Y.
|
|
03/30/2023 | 225-FIRE FINAL BP | GLENDA THORNTON | CORRECTION NOTICE | Building 2 Fire Final | 3/30/2023 12:45:39 PM
The fire alarm company will need to reprogram the FACP to reflect building 1 and 2 are connected to the PIV and OS&Y.
|
|
02/21/2023 | 224-FIRE TCO BP | GLENDA THORNTON | APPROVED | Building 3 TCO | 3/30/2023 6:01:38 PM
Building 3 fire final approved
|
|
11/16/2022 | 225-FIRE FINAL BP | GLENDA THORNTON | APPROVED | Building 11 TCO | 3/30/2023 6:10:19 PM
Building 11 fire final approved
|
|
04/04/2023 | FINAL ACCESSIBILITY | JAMES ALLISON | CANCELLED | eTRAKiT Inspection Request | 3/31/2023 2:03:48 PM
3/31/2023 2:04 PM GUARDIAN CONSTRUCTION LP
Contact Name: GUARDIAN CONSTRUCTION LP
Site Address: 351 E VALPICO RD
Phone: 7609201200
e-Mail: jwoodbury@guardian-capital.com
|
|
04/04/2023 | FINAL ACCESSIBILITY | SHAIN NIVEN | NOT READY | eTRAKiT Inspection Request | 3/31/2023 2:07:54 PM
3/31/2023 2:08 PM GUARDIAN CONSTRUCTION LP
Contact Name: GUARDIAN CONSTRUCTION LP
Site Address: 351 E VALPICO RD
Phone: 7609201200
e-Mail: jwoodbury@guardian-capital.com
|
|
04/05/2023 | FINAL ELECTRICAL** | SHAIN NIVEN | NOT READY | eTRAKiT Inspection Request | 3/31/2023 2:08:41 PM
3/31/2023 2:08 PM GUARDIAN CONSTRUCTION LP
Contact Name: GUARDIAN CONSTRUCTION LP
Site Address: 351 E VALPICO RD
Phone: 7609201200
e-Mail: jwoodbury@guardian-capital.com
|
|
04/06/2023 | 225-FIRE FINAL BP | GLENDA THORNTON | APPROVED | TCO Building 1 | 4/6/2023 12:19:43 PM
Fire inspection approved OK for TCO
|
|
04/06/2023 | ROUGH ELECTRICAL | SHAIN NIVEN | CANCELLED | eTRAKiT Inspection Request | 3/31/2023 2:05:40 PM
3/31/2023 2:05 PM GUARDIAN CONSTRUCTION LP
Contact Name: GUARDIAN CONSTRUCTION LP
Site Address: 351 E VALPICO RD
Phone: 7609201200
e-Mail: jwoodbury@guardian-capital.com
|
|
04/13/2023 | ROUGH ELECTRICAL | SHAIN NIVEN | CORRECTION NOTICE | EV Chargers | 4/12/2023 11:44:13 AM
4/12/2023 11:44 AM GUARDIAN CONSTRUCTION LP
EV Chargers
Contact Name: GUARDIAN CONSTRUCTION LP
Site Address: 351 E VALPICO RD
Phone: 7609201200
e-Mail: matt@rubikbuilt.com
4/13/2023 11:22:38 AM
Inspection for EV chargers, plans do not match as built conditions. Submit revised plans to plan check for review.
All EV chargers are installed using 8AWG (40amp over current protection) approved plans call for 6AWG in some locationsb
Verify bonding requirements for metal EV charging stands.
Revise plans showing correct Buildings that supply power to the EV chargers
|
|
04/17/2023 | ROUGH ELECTRICAL | SHAIN NIVEN | CORRECTION NOTICE | EV charger re inspection | 4/14/2023 3:54:43 PM
4/14/2023 3:54 PM GUARDIAN CONSTRUCTION LP
Contact Name: GUARDIAN CONSTRUCTION LP
Site Address: 351 E VALPICO RD
Phone: 5592237468
e-Mail: jeffc@rubikbuilt.com
4/17/2023 6:34:05 PM
Bonding of all EV chargers approved
As per previous correction, Approval of updated plans showing all as-built conditions still needed
|
|
04/18/2023 | UNDERGROUND PLUMBING | SHAIN NIVEN | PARTIAL APPROVAL | Domestic Water Inspection | 4/17/2023 7:16:42 AM
4/17/2023 7:16 AM GUARDIAN CONSTRUCTION LP
Contact Name: Andrew Cumpian
Site Address: 351 E VALPICO RD
Phone: 2096899445
e-Mail: acumpian@teichert.com
4/18/2023 10:14:53 AM
2" Domestic water to Maintenance building approved
|
|
05/15/2023 | FOOTINGS / PIERS | JAMES ALLISON | CORRECTION NOTICE | eTRAKiT Inspection Request | 5/10/2023 3:28:36 PM
5/10/2023 3:28 PM GUARDIAN CONSTRUCTION LP
Contact Name: GUARDIAN CONSTRUCTION LP
Site Address: 351 E VALPICO RD
Phone: 5592237468
e-Mail: jeffc@rubikbuilt.com
5/15/2023 7:14:33 AM
No approved plans onsite for trash enclosure footing
|
|
05/15/2023 | FOOTINGS / PIERS | SHAIN NIVEN | CORRECTION NOTICE | eTRAKiT Inspection Request | 5/12/2023 3:24:18 PM
5/12/2023 3:24 PM GUARDIAN CONSTRUCTION LP
Contact Name: GUARDIAN CONSTRUCTION LP
Site Address: 351 E VALPICO RD
Phone: 5592237468
e-Mail: Jeffc@rubikbuilt.com
5/15/2023 12:30:51 PM
Inspected Trash enclosure footing located next to maintenance building:
Storm drain is located within trash enclosure footings, provide RFI from Engineer for required repairs.
|
|
| FOOTINGS / PIERS | | | eTRAKiT Inspection Request | 6/1/2023 1:09:12 PM
6/1/2023 1:09 PM GUARDIAN CONSTRUCTION LP
Contact Name: GUARDIAN CONSTRUCTION LP
Site Address: 351 E VALPICO RD
Phone: 5592237468
e-Mail: jeffc@rubikbuilt.com
|
|
06/13/2023 | MASONRY/BLOCK WALL | SHAIN NIVEN | PARTIAL APPROVAL | eTRAKiT Inspection Request | 6/12/2023 12:25:39 PM
6/12/2023 12:25 PM GUARDIAN CONSTRUCTION LP
Contact Name: GUARDIAN CONSTRUCTION LP
Site Address: 351 E VALPICO RD
Phone: 5592237468
e-Mail: jeffc@rubikbuilt.com
6/13/2023 4:18:08 PM
Last remaining trash enclosure / next to maintenance building is approved for grout.
6/13/2023 7:47:00 PM
Last remaining trash enclosure / next to maintenance building is approved for grout.
|
|
06/20/2023 | FOOTINGS / PIERS | SHAIN NIVEN | APPROVED | eTRAKiT Inspection Request | 6/19/2023 8:17:52 AM
6/19/2023 8:17 AM GUARDIAN CONSTRUCTION LP
Carport Pier Footing
Contact Name: GUARDIAN CONSTRUCTION LP
Site Address: 351 E VALPICO RD
Phone: 5592237468
e-Mail: jeffc@rubikbuilt.com
6/20/2023 3:36:18 PM
Footings for carport at maintenance building approved
|
|
06/27/2023 | FINAL ACCESSIBILITY | SHAIN NIVEN | CORRECTION NOTICE | | 6/27/2023 2:05:30 PM
• Re-stripe Van accessible parking and access aisle at covered parking., add detectable warnings as needed. Between building 10 & 11
• Pavers at South side between buildings 9 & 10 exceed 5% slope and 2% cross slope
• Pavers at South side of between buildings 6 & 8 exceed 5% slope and 2% cross slope, and 2% cross slope at north side
• Accessible walkway at North/East side of building 8 exceeds 5% slope
• Van accessible parking between buildings 8 & 9, access aisle exceeds 2% cross slope, provide van parking sign
• Accessible parking stall between buildings 8 & 9 access aisle exceeds 5% slope
• Accessible path to trash enclosure North side of building 9 exceeds 2% cross slope
• Missing Van accessible parking sign North side of building 8
• Re-stripe Van accessible parking stall and access aisle North side of building 8 (carport column location)
• Remove van sign from non van accessible parking stall North side building 6, add accessible parking sign
• Re-stripe van accessible parking / access aisle at North side of building 5 (Carport column located within striping not allowed) see plan page A.01.111
• Between buildings 4 and 5, remove striping and signage for non compliant parking stall
• Between club house and building 4, cross wall exceeds 2% cross slope north side
• At van accessible stall building #3, add van parking sign
• West side of building 1 accessible walk way exceeds 2% cross slope
• West side of building 1 to trash enclosure, exceeds 2% cross slope
• Van accessible parking Playground location, access aisle exceeds 2% cross slope / column location
Note: Due to on going construction and debris, Van and Standard accessible parking stalls not inspected at Maintenance building location as of next
Path of travel to trash enclosure next to maintenance building not inspected
All gates doors surrounding property have not been inspected
South/West side of building 7, walkway under construction as of 6/27/23
Ramp to pool from playground area under construction as of 6/27/23
|
|
06/27/2023 | FINAL ACCESSIBILITY | SHAIN NIVEN | CORRECTION NOTICE | eTRAKiT Inspection Request | 6/19/2023 8:19:44 AM
6/19/2023 8:19 AM GUARDIAN CONSTRUCTION LP
Pre-Inspection
Contact Name: GUARDIAN CONSTRUCTION LP
Site Address: 351 E VALPICO RD
Phone: 5592237468
e-Mail: jeffc@rubikbuilt.com
6/27/2023 2:06:11 PM
See correction notice dated 6/27/23
|
|
| FINAL ACCESSIBILITY | | | | |
|
07/06/2023 | 222-GENERAL FINAL | GLENDA THORNTON | CORRECTION NOTICE | Correction Notice | 7/6/2023 5:22:35 PM
The onsite contractor contacted us regarding the material used for the apartment complex emergency vehicle turn around. The material that was used for the access turn around does not match the approved plans, please resubmit plans to the building department with the updated material that was used for the access turn around.
Please order the locking FDC caps for all FDCs on the premises, after they have been received contact SSJCFA to have an inspector install the caps before the final sign off.
CORRECTION REQUIRED
Required Corrections
|
|
07/11/2023 | FOOTINGS / PIERS | SHAIN NIVEN | PARTIAL APPROVAL | Retaining Wall Footing | 7/10/2023 4:49:16 PM
7/10/2023 4:49 PM GUARDIAN CONSTRUCTION LP
Around 11am. concrete pour scheduled for the afternoon
Contact Name: GUARDIAN CONSTRUCTION LP
Site Address: 351 E VALPICO RD
Phone: 5592237468
e-Mail: jeffc@rubikbuilt.com
7/11/2023 4:01:30 PM
Footings for retaining wall at maintenance building location approved
|
|
| FOOTINGS / PIERS | | | Retaining Wall | 7/13/2023 1:59:52 PM
7/13/2023 1:59 PM GUARDIAN CONSTRUCTION LP
Contact Name: GUARDIAN CONSTRUCTION LP
Site Address: 351 E VALPICO RD
Phone: 5592237468
e-Mail: jeffc@rubikbuilt.com
|
|
07/17/2023 | FOOTINGS / PIERS | SHAIN NIVEN | PARTIAL APPROVAL | Retaining Wall | 7/13/2023 5:39:14 PM
7/13/2023 5:39 PM GUARDIAN CONSTRUCTION LP
Contact Name: GUARDIAN CONSTRUCTION LP
Site Address: 351 E VALPICO RD
Phone: 5592237468
e-Mail: jeffc@rubikbuilt.com
7/17/2023 11:46:39 AM
Retaining wall reinforcement at maintenance building location approved.
|
|
07/21/2023 | 225-FIRE FINAL BP | DAN STOWE | CORRECTION NOTICE | No charge | 7/21/2023 5:40:10 PM
Status: NOTED
Notes: Electronic gates on east side of property missing emergency optical sensors and Knox Key switches. Speed bumps noted on property that weren't there in December of 2022. Missing signage on OS&Y east side of Property and Maintenance Building FDC. Hydrant by building 11 the 4.5 inch hydrant cap was broken so it couldn't be utilized.
Status: Correction required
Notes: Obtain permit through City of Tracy Building Department for the 3 Speed Bumps installed on property.
Provide Optical 2 Optical sensors for electronic gates on east side of property.
2 Knox key switches for electronic gates on east side of property.
Provide 1 4.5 inch Nation Standard Thread Fire Hydrant cap for fire hydrant by building 11.
Provide 2 Knox Locking Fire Department Caps on each FDC on the property.
Provide sign on FDC for Maintenance Building
Provide sign of address on East Side and West Side Black flow preventers
|
|
08/02/2023 | 209-FIRE ALRM FIN** | GLENDA THORNTON | APPROVED | Approved | 8/2/2023 3:25:19 PM
The fire alarm final is approved all installed devices have been tested and verified at the FACP and through central dispatch, the 24 hour batter test and 5 min ring out have been completed the system has been left live.
|
|
08/02/2023 | 207-FIRE SPKR FINAL* | GLENDA THORNTON | APPROVED | Approved | 8/2/2023 3:26:39 PM
Fire sprinkler final approved for the maintenance building
|
|
08/02/2023 | 225-FIRE FINAL BP | GLENDA THORNTON | APPROVED | Building 1 | 8/2/2023 3:32:56 PM
Building 1 is approved for the final fire inspection.
|
|
08/02/2023 | 225-FIRE FINAL BP | GLENDA THORNTON | APPROVED | Building 2 | 8/2/2023 3:38:40 PM
Building 2 fire final approved
|
|
08/02/2023 | 225-FIRE FINAL BP | GLENDA THORNTON | APPROVED | Building 3 | 8/2/2023 3:43:41 PM
Building 3 fire final approved
|
|
08/02/2023 | 225-FIRE FINAL BP | GLENDA THORNTON | APPROVED | Building 4 | 8/2/2023 3:52:18 PM
Building 4 fire final approved
|
|
08/02/2023 | 225-FIRE FINAL BP | GLENDA THORNTON | APPROVED | Building 5 | 8/2/2023 3:56:40 PM
Building 5 fire final approved
|
|
08/02/2023 | 225-FIRE FINAL BP | GLENDA THORNTON | APPROVED | Building 6 | 8/2/2023 4:02:03 PM
Building 6 fire final approved
|
|
08/02/2023 | 225-FIRE FINAL BP | GLENDA THORNTON | APPROVED | Approved | 8/2/2023 4:07:57 PM
Building 7 fire final approved
|
|
08/02/2023 | 225-FIRE FINAL BP | GLENDA THORNTON | CORRECTION NOTICE | Building 8 | 8/2/2023 4:18:39 PM
Replace the broken Knox box on building 8 and add a key for the FACP room and electrical room.
|
|
08/02/2023 | 225-FIRE FINAL BP | GLENDA THORNTON | APPROVED | Building 9 | 8/2/2023 4:23:18 PM
Building 9 fire final approved
|
|
08/02/2023 | 225-FIRE FINAL BP | GLENDA THORNTON | APPROVED | Building 10 | 8/2/2023 4:30:49 PM
Building 10 fire final approved
|
|
08/02/2023 | 225-FIRE FINAL BP | GLENDA THORNTON | APPROVED | Building 11 | 8/2/2023 4:35:33 PM
Building 11 fire final approved
|
|
08/02/2023 | 225-FIRE FINAL BP | GLENDA THORNTON | CORRECTION NOTICE | Building 13 | 8/2/2023 5:38:57 PM
Signs need to be placed on the PIV and FDC stating for building 13.
Signs need to placed on the exterior door of the maintenance building for the fire alarm control panel room.
Install a Knox box on the exterior of the building for emergency access.
|
|
08/01/2023 | FINAL PLANNING | ILSE LOPEZ NARVAEZ | CORRECTION NOTICE | Corrections Needed | 8/3/2023 6:23:28 PM
See Attachments
|
|
08/03/2023 | FINAL ACCESSIBILITY | SHAIN NIVEN | CORRECTION NOTICE | eTRAKiT Inspection Request | 8/1/2023 4:13:11 PM
8/1/2023 4:13 PM GUARDIAN CONSTRUCTION LP
Contact Name: GUARDIAN CONSTRUCTION LP
Site Address: 351 E VALPICO RD
Phone: 2098602324
e-Mail: will@rubikbuilt.com
8/3/2023 8:44:09 PM
Inspector met Superintendent Jeff onsite to review accessible van stall and EV - van stall requirements.
|
|
08/09/2023 | 225-FIRE FINAL BP | GLENDA THORNTON | APPROVED | Building 13 | 8/9/2023 3:35:31 PM
All signs have been installed, the fire alarm and fire sprinklers have been approved, system is live building approved per pre approved plans and building officials approval.
|
|
08/09/2023 | 225-FIRE FINAL BP | GLENDA THORNTON | APPROVED | Building 8 | 8/9/2023 5:16:44 PM
Fire final approved
|
|
08/15/2023 | 225-FIRE FINAL BP | GLENDA THORNTON | APPROVED | Approved | 8/15/2023 4:54:16 PM
The locking FDC caps throughout the premises have been installed.
|
|
08/15/2023 | FINAL ACCESSIBILITY | SHAIN NIVEN | NOT READY | eTRAKiT Inspection Request | 8/14/2023 6:16:49 PM
8/14/2023 6:16 PM GUARDIAN CONSTRUCTION LP
Contact Name: GUARDIAN CONSTRUCTION LP
Site Address: 351 E VALPICO RD
Phone: 5592237468
e-Mail: jeffc@rubikbuilt.com
|
|
08/16/2023 | FINAL ACCESSIBILITY | SHAIN NIVEN | CORRECTION NOTICE | | 8/16/2023 7:23:13 PM
Van accessible parking and access aisle at covered parking, for both Van and EV-Van locations Between building 10 & 11, does not meet minimum dimension requirements due to covered parking columns, relocate / re-stripe Van and EV-Van parking.
- Pavers at South side between buildings 9 & 10 exceed 5% slope and 2% cross slope
- Pavers at South side of between buildings 6 & 8 exceed 5% slope and 2% cross slope, and 2% cross slope at north side
- Van accessible parking between buildings 8 & 9, access aisle exceeds 2% cross slope, provide van parking sign
- Accessible parking stall between buildings 8 & 9 access aisle exceeds 5% slope
- West side of building 1 accessible walk way exceeds 2% cross slope
- West side of building 1 to trash enclosure, exceeds 2% cross slope
- Ramp at building 7 to bus stop location. Bottom landing does not meet minimum door swing dimensions, and handrail extensions shall not be turned out. Note: Per meeting with City Engineering department, ramp railings do not confirm to city standards at public right of way. Please contact Engineering to revise plans and build per approved city standards and accessibility requirements.
|
|
08/16/2023 | FINAL ACCESSIBILITY | SHAIN NIVEN | CORRECTION NOTICE | eTRAKiT Inspection Request | 7/25/2023 5:20:07 PM
7/25/2023 5:19 PM GUARDIAN CONSTRUCTION LP
Rework correction notice
Contact Name: GUARDIAN CONSTRUCTION LP
Site Address: 351 E VALPICO RD
Phone: 2098602324
e-Mail: will@rubikbuilt.com
8/16/2023 7:23:15 PM
Van accessible parking and access aisle at covered parking, for both Van and EV-Van locations Between building 10 & 11, does not meet minimum dimension requirements due to covered parking columns, relocate / re-stripe Van and EV-Van parking.
- Pavers at South side between buildings 9 & 10 exceed 5% slope and 2% cross slope
- Pavers at South side of between buildings 6 & 8 exceed 5% slope and 2% cross slope, and 2% cross slope at north side
- Van accessible parking between buildings 8 & 9, access aisle exceeds 2% cross slope, provide van parking sign
- Accessible parking stall between buildings 8 & 9 access aisle exceeds 5% slope
- West side of building 1 accessible walk way exceeds 2% cross slope
- West side of building 1 to trash enclosure, exceeds 2% cross slope
- Ramp at building 7 to bus stop location. Bottom landing does not meet minimum door swing dimensions, and handrail extensions shall not be turned out. Note: Per meeting with City Engineering department, ramp railings do not confirm to city standards at public right of way. Please contact Engineering to revise plans and build per approved city standards and accessibility requirements.
|
|
08/18/2023 | FINAL STORM WATER | CALEB SMITH | APPROVED | Final Approved Stormwater | 8/18/2023 11:33:31 AM
Final approved for Stormwater
|
|
08/18/2023 | WELO FINAL | CALEB SMITH | APPROVED | Final Approved WELO | 8/18/2023 11:34:12 AM
Final Approved for WELO
|
|
| FINAL PLANNING | ILSE LOPEZ NARVAEZ | | FINAL TO BE SCHEDULED | 10/9/2023 5:09:31 PM
Pending notification from Contractor re: when to go out and do a final inspection
|
|